IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

53

matching recommendations
Reset
SIC 332 Iron And Steel Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0476 # 05 Y:2015 05 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,486 $722 Not Implemented
SF0476 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $63,239 $121,403 Implemented
SF0476 # 08 Y:2015 08 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,971 $4,378 Not Implemented
SF0476 # 07 Y:2015 07 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $1,324 $215 Implemented
SF0476 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,871 $0 Implemented
SF0476 # 11 Y:2015 11 2015 INSTALL OCCUPANCY SENSORS $7,038 $21,100 Implemented
SF0476 # 10 Y:2015 10 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,176 $17,481 Not Implemented
SF0476 # 03 Y:2015 03 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,817 $0 Implemented
SF0476 # 06 Y:2015 06 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,722 $386 Implemented
SF0476 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,100 $280 Implemented
SF0476 # 04 Y:2015 04 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $8,163 $913 Implemented
UA0149 # 01 Y:2015 01 2015 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $399,011 $500,000 Not Implemented
UA0149 # 02 Y:2015 02 2015 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $193,249 $400,000 Not Implemented
UA0149 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,435 $41,578 Implemented
UA0149 # 04 Y:2015 04 2015 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $51,808 $3,396 Not Implemented
UA0149 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,614 $2,218 Not Implemented
UA0149 # 06 Y:2015 06 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $37,056 $105,000 Not Implemented
UA0149 # 07 Y:2015 07 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $36,942 $3,180 Implemented
UA0149 # 08 Y:2015 08 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,089 $500 Not Implemented
BS0065 # 03 Y:2015 03 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,088 $160 Implemented
BS0065 # 02 Y:2015 02 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,215 $10,715 Not Implemented
BS0065 # 04 Y:2015 04 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $148 $15 Implemented
BS0065 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,229 $46,340 Implemented
UA0144 # 04 Y:2015 04 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $46,229 $200,000 Not Implemented
UA0144 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,698 $5,781 Not Implemented