Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
32
matching recommendationsSIC | 332 | Iron And Steel Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0246 # 08 Y:2020 | 08 | 2020 | OPTIMIZE PLANT POWER FACTOR | $5,728 | $12,000 | Not Implemented |
TT0246 # 07 Y:2020 | 07 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,067 | $33,750 | Not Implemented |
TT0246 # 06 Y:2020 | 06 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $58,939 | $31,200 | Implemented |
TT0246 # 05 Y:2020 | 05 | 2020 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $65,738 | $130,000 | Not Implemented |
TT0246 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $86,933 | $48,800 | Not Implemented |
TT0246 # 03 Y:2020 | 03 | 2020 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $492,629 | $66,000 | Implemented |
TT0246 # 02 Y:2020 | 02 | 2020 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $955,149 | $750,000 | Implemented |
TT0246 # 01 Y:2020 | 01 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,809,194 | $245,104 | Not Implemented |
OK1033 # 04 Y:2020 | 04 | 2020 | INSTALL TIMERS AND/OR THERMOSTATS | $343 | $0 | Not Implemented |
OK1033 # 05 Y:2020 | 05 | 2020 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,056 | $671 | Not Implemented |
OK1033 # 03 Y:2020 | 03 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $262 | $700 | Implemented |
OK1033 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,570 | $27,786 | Implemented |
OK1033 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,433 | $2,100 | Implemented |
WM0157 # 01 Y:2020 | 01 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $59,393 | $500,000 | Not Implemented |
WM0157 # 04 Y:2020 | 04 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $15,160 | $6,952 | Not Implemented |
WM0157 # 03 Y:2020 | 03 | 2020 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $18,997 | $0 | Implemented |
WM0157 # 07 Y:2020 | 07 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,942 | $3,194 | Implemented |
WM0157 # 06 Y:2020 | 06 | 2020 | USE COMPRESSOR AIR FILTERS | $4,984 | $19,040 | Not Implemented |
WM0157 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $32,506 | $160,650 | Not Implemented |
WM0157 # 05 Y:2020 | 05 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $12,261 | $51,086 | Not Implemented |
AM0801 # 06 Y:2020 | 06 | 2020 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $580 | $300 | Implemented |
AM0801 # 05 Y:2020 | 05 | 2020 | INSTALL OCCUPANCY SENSORS | $1,150 | $420 | Not Implemented |
AM0801 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,875 | $2,660 | Implemented |
AM0801 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,735 | $9,030 | Implemented |
AM0801 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,240 | $1,265 | Not Implemented |