Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
47
matching recommendationsSIC | 332 | Iron And Steel Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0315 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,959 | $820 | n/a |
IC0315 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $82,148 | $379,057 | n/a |
IC0315 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,478 | $227 | n/a |
IC0315 # 08 Y:2024 | 08 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $525 | $242 | n/a |
IC0315 # 04 Y:2024 | 04 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,069 | $442 | n/a |
IC0315 # 05 Y:2024 | 05 | 2024 | INSULATE BARE EQUIPMENT | $6,223 | $2,225 | n/a |
IC0315 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $1,133 | $1,850 | n/a |
IC0315 # 07 Y:2024 | 07 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $14,991 | $7,497 | n/a |
IC0315 # 10 Y:2024 | 10 | 2024 | USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING | $369,968 | $14,366 | n/a |
IC0315 # 09 Y:2024 | 09 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,224 | $0 | n/a |
IC0315 # 11 Y:2024 | 11 | 2024 | USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING | $12,134 | $7,693 | n/a |
MU0058 # 02 Y:2024 | 02 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $40,066 | $1 | n/a |
MU0058 # 09 Y:2024 | 09 | 2024 | PAY BILLS ON TIME TO AVOID LATE FEES | $613 | $0 | n/a |
MU0058 # 08 Y:2024 | 08 | 2024 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $4,637 | $623 | n/a |
MU0058 # 07 Y:2024 | 07 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $2,805 | $870 | n/a |
MU0058 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,944 | $1,620 | n/a |
MU0058 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $99 | $118 | n/a |
MU0058 # 04 Y:2024 | 04 | 2024 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $253 | $0 | n/a |
MU0058 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $239 | $34 | n/a |
MU0058 # 01 Y:2024 | 01 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $135 | $370 | n/a |
SJ0019 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,572 | $10,571 | n/a |
SJ0019 # 05 Y:2024 | 05 | 2024 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $253 | $332 | n/a |
SJ0019 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $585 | $0 | n/a |
SJ0019 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $641 | $72 | n/a |
SJ0019 # 09 Y:2024 | 09 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $760 | $1,897 | n/a |