IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

55

matching recommendations
Reset
SIC 3321 Gray And Ductile Iron Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0328 # 01 Y:1999 01 1999 PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW $12,717 $27,395 Implemented
ND0328 # 09 Y:1999 09 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $293 $350 Not Implemented
ND0328 # 08 Y:1999 08 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $285 $0 Implemented
ND0328 # 07 Y:1999 07 1999 USE OPTIMUM THICKNESS INSULATION $489 $1,068 Not Implemented
ND0328 # 06 Y:1999 06 1999 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $748 $250 Implemented
ND0328 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $892 $200 Not Implemented
ND0328 # 04 Y:1999 04 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $912 $950 Implemented
ND0328 # 03 Y:1999 03 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $6,212 $7,590 Implemented
ND0328 # 02 Y:1999 02 1999 INSULATE BARE EQUIPMENT $8,575 $1,100 Not Implemented
ND0328 # 10 Y:1999 10 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $120 $75 Implemented
TP0005 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,894 $88 Not Implemented
TP0005 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,720 $0 Implemented
TP0005 # 03 Y:1999 03 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,348 $4,741 Implemented
TP0005 # 04 Y:1999 04 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,671 $7,300 Implemented
TP0005 # 05 Y:1999 05 1999 USE SYNTHETIC LUBRICANT $991 $0 Not Implemented
TP0005 # 06 Y:1999 06 1999 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $358 $0 Implemented
ND0326 # 06 Y:1999 06 1999 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $6,520 $14,100 Not Implemented
ND0326 # 04 Y:1999 04 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $60 $87 Implemented
ND0326 # 07 Y:1999 07 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $568 $1,800 Not Implemented
ND0326 # 05 Y:1999 05 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $198 $40 Implemented
ND0326 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $126 $160 Not Implemented
ND0326 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $11,257 $2,000 Not Implemented
ND0326 # 09 Y:1999 09 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $-300 $1,118 Not Implemented
ND0326 # 08 Y:1999 08 1999 MINIMIZE WATER USAGE $912 $1,760 Not Implemented
ND0326 # 01 Y:1999 01 1999 PREHEAT COMBUSTION AIR WITH WASTE HEAT $214,338 $180,000 Not Implemented