Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
22
matching recommendationsSIC | 3321 | Gray And Ductile Iron Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0149 # 08 Y:2015 | 08 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $17,089 | $500 | Not Implemented |
UA0149 # 07 Y:2015 | 07 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $36,942 | $3,180 | Implemented |
UA0149 # 06 Y:2015 | 06 | 2015 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $37,056 | $105,000 | Not Implemented |
UA0149 # 05 Y:2015 | 05 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,614 | $2,218 | Not Implemented |
UA0149 # 01 Y:2015 | 01 | 2015 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $399,011 | $500,000 | Not Implemented |
UA0149 # 02 Y:2015 | 02 | 2015 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $193,249 | $400,000 | Not Implemented |
UA0149 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,435 | $41,578 | Implemented |
UA0149 # 04 Y:2015 | 04 | 2015 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $51,808 | $3,396 | Not Implemented |
UA0144 # 01 Y:2015 | 01 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,060 | $800 | Implemented |
UA0144 # 02 Y:2015 | 02 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,659 | $2,995 | Implemented |
UA0144 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,698 | $5,781 | Not Implemented |
UA0144 # 04 Y:2015 | 04 | 2015 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $46,229 | $200,000 | Not Implemented |
UM0457 # 03 Y:2015 | 03 | 2015 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $154,545 | $50,000 | Not Implemented |
UM0457 # 02 Y:2015 | 02 | 2015 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $162,816 | $1,000 | Implemented |
UM0457 # 01 Y:2015 | 01 | 2015 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $261,975 | $300,000 | Not Implemented |
UA0135 # 07 Y:2015 | 07 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,926 | $10,430 | Implemented |
UA0135 # 06 Y:2015 | 06 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $115,247 | $202,454 | Not Implemented |
UA0135 # 05 Y:2015 | 05 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,250 | $5,480 | Not Implemented |
UA0135 # 04 Y:2015 | 04 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,333 | $5,604 | Not Implemented |
UA0135 # 03 Y:2015 | 03 | 2015 | UPGRADE CONTROLS ON COMPRESSORS | $19,427 | $5,250 | Not Implemented |
UA0135 # 02 Y:2015 | 02 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $79,593 | $13,795 | Not Implemented |
UA0135 # 01 Y:2015 | 01 | 2015 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $101,481 | $4,160 | Not Implemented |