IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

93

matching recommendations
Reset
SIC 3325 Steel Foundries, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0682 # 01 Y:2015 01 2015 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $6,985 $2,000 Not Implemented
AM0682 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $585 $5 Implemented
AM0682 # 07 Y:2015 07 2015 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $430 $0 Not Implemented
AM0682 # 10 Y:2015 10 2015 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $150 $0 Implemented
AM0682 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,480 $1,000 Implemented
AM0682 # 05 Y:2015 05 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,840 $1,790 Implemented
AM0682 # 03 Y:2015 03 2015 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $4,320 $5,400 Not Implemented
AM0682 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $211 $75 Implemented
AM0682 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,295 $7,280 Not Implemented
AM0682 # 09 Y:2015 09 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $170 $200 Implemented
AM0582 # 08 Y:2010 08 2010 OPTIMIZE PLANT POWER FACTOR $27,950 $0 Not Implemented
AM0582 # 04 Y:2010 04 2010 Hire Energy Manager $97,900 $0 Not Implemented
AM0582 # 10 Y:2010 10 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,400 $2,000 Implemented
AM0582 # 12 Y:2010 12 2010 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,540 $130 Implemented
AM0582 # 11 Y:2010 11 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,120 $430 Not Implemented
AM0582 # 09 Y:2010 09 2010 INSTALL SKYLIGHTS $15,400 $14,200 Not Implemented
AM0582 # 02 Y:2010 02 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $147,000 $5,600 Implemented
AM0582 # 07 Y:2010 07 2010 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $33,670 $2,400 Not Implemented
AM0582 # 06 Y:2010 06 2010 INSTALL SUB-METERING EQUIPMENT $48,000 $5,000 Implemented
AM0582 # 01 Y:2010 01 2010 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $404,300 $3,000 Implemented
AM0582 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $116,300 $220,000 Implemented
AM0582 # 05 Y:2010 05 2010 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $64,500 $50,000 Not Implemented
AM0448 # 04 Y:2003 04 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,200 $1,550 Not Implemented
AM0448 # 05 Y:2003 05 2003 USE SYNTHETIC LUBRICANT $4,032 $0 Implemented
AM0448 # 06 Y:2003 06 2003 INSULATE BARE EQUIPMENT $2,200 $2,000 Implemented