IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 3325 Steel Foundries, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0212 # 02 Y:1997 02 1997 INSTALL OCCUPANCY SENSORS $1,611 $2,475 Not Implemented
AS0212 # 12 Y:1997 12 1997 $5,201,240 $28,946 Not Implemented
AS0212 # 11 Y:1997 11 1997 $10,130 $10,250 Implemented
AS0212 # 10 Y:1997 10 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,320 $120 Not Implemented
AS0212 # 09 Y:1997 09 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $432 $60 Implemented
AS0212 # 08 Y:1997 08 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $53,109 $64,120 Not Implemented
AS0212 # 07 Y:1997 07 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,979 $8,806 Not Implemented
AS0212 # 06 Y:1997 06 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,877 $0 Implemented
AS0212 # 05 Y:1997 05 1997 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,536 $4,800 Implemented
AS0212 # 04 Y:1997 04 1997 USE SYNTHETIC LUBRICANT $878 $800 Implemented
AS0212 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,975 $24,800 Implemented
AS0212 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,076 $13,917 Not Implemented
AS0077 # 01 Y:1993 01 1993 REDESIGN PROCESS $15,475 $11,000 Not Implemented
AS0077 # 09 Y:1993 09 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,136 $0 Implemented
AS0077 # 08 Y:1993 08 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $473 $2,507 Implemented
AS0077 # 07 Y:1993 07 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,482 $81,500 Not Implemented
AS0077 # 06 Y:1993 06 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,281 $500 Implemented
AS0077 # 05 Y:1993 05 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $28,014 $135,000 Not Implemented
AS0077 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $251 $1,440 Not Implemented
AS0077 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,200 $15,080 Not Implemented
AS0077 # 02 Y:1993 02 1993 INSULATE BARE EQUIPMENT $10,939 $9,136 Implemented