IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

135

matching recommendations
Reset
SIC 3339 Primary Nonferrous Metals, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0022 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,344 $4,614 Implemented
UM0022 # 03 Y:1995 03 1995 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $31,536 $250 Implemented
UM0022 # 04 Y:1995 04 1995 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,583 $6,080 Not Implemented
AS0115 # 01 Y:1994 01 1994 USE SYNTHETIC LUBRICANT $547 $1,774 Implemented
AS0115 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,197 $7,621 Implemented
AS0115 # 03 Y:1994 03 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,056 $18,320 Not Implemented
AS0115 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,970 $13,000 Not Implemented
AS0115 # 05 Y:1994 05 1994 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $4,051 $7,317 Implemented
AS0115 # 06 Y:1994 06 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $30,413 $135,000 Not Implemented
OK0401 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,436 $648 Implemented
OK0401 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,229 $12,281 Implemented
OK0401 # 03 Y:1993 03 1993 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,081 $69 Implemented
OK0401 # 04 Y:1993 04 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,239 $11,720 Not Implemented
OK0401 # 05 Y:1993 05 1993 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $352 $168 Implemented
OK0401 # 06 Y:1993 06 1993 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $21,033 $8,169 Not Implemented
OK0401 # 07 Y:1993 07 1993 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $8,585 $31,250 Not Implemented
CO0141 # 01 Y:1989 01 1989 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $33,200 $6,700 Implemented
CO0141 # 02 Y:1989 02 1989 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,410 $5,000 Implemented
CO0141 # 03 Y:1989 03 1989 INSULATE BARE EQUIPMENT $351 $3,460 Not Implemented
CO0141 # 04 Y:1989 04 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,887 $4,162 Implemented
CO0141 # 05 Y:1989 05 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,494 $2,200 Implemented
CO0141 # 06 Y:1989 06 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,193 $10,000 Not Implemented
CO0141 # 07 Y:1989 07 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $800 $700 Implemented
CO0141 # 08 Y:1989 08 1989 INSTALL TIMERS AND/OR THERMOSTATS $657 $750 Implemented
CO0141 # 09 Y:1989 09 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $307 $359 Implemented