IAC Assessment: AS0115
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0115
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1994
Principal Product Precious metal reclamation
NAICS n/a
SIC 3339 - Primary Nonferrous Metals, Nec
Sales $50,000,000-$100,000,000
# of Employees 14
Plant Area (Sq.Ft.) 22,500
Annual Production 1,200,000 Pounds
Production Hrs. Annual 2,288
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $127,492 1,010,844 kWh $0.13
Natural Gas $74,924 16,655 MMBtu $4.50
TOTAL ENERGY COSTS $202,416
RECOMMENDED SAVINGS* $49,234 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,795
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$547
Cost:
$1,774
$547 2,345 - - $547
2,345
kWh
-
-
MMBtu
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,197
Cost:
$7,621
$3,197 25,498 - - $3,197
25,498
kWh
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,056
Cost:
$18,320
$9,056 71,805 - - $9,056
71,805
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,970
Cost:
$13,000
$1,970 15,533 - - $1,970
15,533
kWh
-
-
MMBtu
05: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS Savings:
$4,051
Cost:
$7,317
$4,051 32,239 - - $4,051
32,239
kWh
-
-
MMBtu
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$30,413
Cost:
$135,000
- - $30,413 - -
-
kWh
$30,413
-
MMBtu
TOTAL RECOMMENDED Savings:
$49,234
Cost:
$183,032
$18,821 147,420 $30,413 - $18,821
147,420
kWh
$30,413
-
MMBtu
TOTAL IMPLEMENTED Savings:
$7,795
Cost:
$16,712
$7,795 60,082 - - $7,795
60,082
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas