IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

58

matching recommendations
Reset
SIC 334 Secondary Nonferrous Metals
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1313 # 04 Y:2013 04 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,510 $5,000 Implemented
UD0888 # 10 Y:2013 10 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $695 $0 Not Implemented
UD0888 # 09 Y:2013 09 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,246 $3,000 Implemented
UD0888 # 08 Y:2013 08 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,313 $0 Implemented
UD0888 # 07 Y:2013 07 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $7,011 $0 Implemented
UD0888 # 06 Y:2013 06 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $74,025 $55,000 Not Implemented
UD0888 # 05 Y:2013 05 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,528 $0 Not Implemented
UD0888 # 04 Y:2013 04 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,510 $5,000 Implemented
UD0888 # 03 Y:2013 03 2013 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $23,080 $10,000 Not Implemented
UD0888 # 02 Y:2013 02 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $841 $0 Implemented
UD0888 # 01 Y:2013 01 2013 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $396 $5,000 Implemented
UK1313 # 02 Y:2013 02 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $841 $0 Implemented
UK1313 # 21 Y:2013 21 2013 CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING $4,400 $0 Implemented
UD0888 # 14 Y:2013 14 2013 DEVELOP A REPAIR/REPLACE POLICY $3,770 $0 Implemented
UK1313 # 03 Y:2013 03 2013 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $23,080 $10,000 Implemented
UD0888 # 11 Y:2013 11 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,284 $15,000 Implemented
UD0888 # 19 Y:2013 19 2013 IMPROVE COMBUSTION CONTROL CAPABILITY $262,538 $700,000 Not Implemented
UD0888 # 12 Y:2013 12 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $20,092 $0 Implemented
UD0888 # 16 Y:2013 16 2013 INSULATE BARE EQUIPMENT $6,807 $894 Not Implemented
UD0888 # 18 Y:2013 18 2013 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $21,538 $2,500 Not Implemented
UD0888 # 13 Y:2013 13 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,444 $4,500 Not Implemented
UD0888 # 20 Y:2013 20 2013 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $412 $0 Implemented
UK1313 # 01 Y:2013 01 2013 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $396 $5,000 Implemented
UD0888 # 15 Y:2013 15 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $913 $2,119 Not Implemented
UD0888 # 17 Y:2013 17 2013 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,679 $5,000 Not Implemented