IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

438

matching recommendations
Reset
SIC 3341 Secondary Nonferrous Metals
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0262 # 04 Y:1996 04 1996 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $28,400 $8,250 Not Implemented
OR0262 # 05 Y:1996 05 1996 OPTIMIZE PLANT POWER FACTOR $3,101 $6,600 Not Implemented
OR0262 # 06 Y:1996 06 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,084 $10,701 Not Implemented
OR0262 # 07 Y:1996 07 1996 UPGRADE CONTROLS ON COMPRESSORS $6,882 $27,454 Not Implemented
DS0032 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,587 $8,977 Implemented
DS0032 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,678 $3,457 Implemented
DS0032 # 03 Y:1995 03 1995 TURN OFF EQUIPMENT WHEN NOT IN USE $2,608 $1,920 Implemented
DS0032 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $137 $360 Implemented
DS0032 # 05 Y:1995 05 1995 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $1,006 $2,157 Implemented
TN0564 # 01 Y:1995 01 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $22,299 $15,600 Not Implemented
TN0564 # 02 Y:1995 02 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $19,726 $0 Implemented
TN0564 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,969 $3,000 Not Implemented
TN0564 # 04 Y:1995 04 1995 CLOSE OFF UNNEEDED STEAM LINES $1,642 $0 Not Implemented
TN0564 # 05 Y:1995 05 1995 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,743 $4,800 Not Implemented
TN0564 # 06 Y:1995 06 1995 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,345 $950 Not Implemented
TN0564 # 07 Y:1995 07 1995 USE SYNTHETIC LUBRICANT $4,427 $0 Not Implemented
TN0564 # 08 Y:1995 08 1995 USE OPTIMUM TEMPERATURE $597 $0 Not Implemented
TN0564 # 09 Y:1995 09 1995 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $77,516 $0 Not Implemented
TN0564 # 10 Y:1995 10 1995 RECYCLE WHITE WATER $32,232 $31,600 Not Implemented
TN0564 # 11 Y:1995 11 1995 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $25,642 $38,600 Not Implemented
TN0564 # 12 Y:1995 12 1995 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $9,920 $0 Not Implemented
WI0234 # 01 Y:1995 01 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,900 $22,275 Not Implemented
WI0234 # 02 Y:1995 02 1995 INSULATE BARE EQUIPMENT $3,351 $1,171 Not Implemented
WI0234 # 03 Y:1995 03 1995 INSULATE BARE EQUIPMENT $1,846 $1,187 Not Implemented
WI0234 # 04 Y:1995 04 1995 COVER OPEN TANKS $1,743 $3,312 Not Implemented