Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsSIC | 3341 | Secondary Nonferrous Metals |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0126 # 04 Y:2013 | 04 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $328 | $575 | Not Implemented |
MZ0126 # 03 Y:2013 | 03 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,939 | $770 | Not Implemented |
MZ0126 # 02 Y:2013 | 02 | 2013 | INSTALL OCCUPANCY SENSORS | $3,501 | $780 | Implemented |
MZ0126 # 01 Y:2013 | 01 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,531 | $32,100 | Not Implemented |
MZ0107 # 01 Y:2013 | 01 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $76,156 | $80,528 | Not Implemented |
MZ0107 # 02 Y:2013 | 02 | 2013 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $43,709 | $1,000 | Implemented |
MZ0107 # 03 Y:2013 | 03 | 2013 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $12,972 | $3,240 | Not Implemented |
MZ0107 # 04 Y:2013 | 04 | 2013 | USE OPTIMUM THICKNESS INSULATION | $6,130 | $1,825 | Implemented |
MZ0107 # 05 Y:2013 | 05 | 2013 | INSTALL OCCUPANCY SENSORS | $4,907 | $3,080 | Implemented |
MZ0107 # 06 Y:2013 | 06 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,600 | $1,745 | Implemented |
MZ0107 # 07 Y:2013 | 07 | 2013 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $2,484 | $1,261 | Not Implemented |
MZ0107 # 08 Y:2013 | 08 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,356 | $710 | Implemented |
MZ0107 # 09 Y:2013 | 09 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,541 | $1,810 | Implemented |
MZ0107 # 10 Y:2013 | 10 | 2013 | USE OPTIMUM THICKNESS INSULATION | $1,288 | $1,499 | Implemented |
MZ0107 # 11 Y:2013 | 11 | 2013 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $845 | $1,115 | Implemented |
MZ0107 # 12 Y:2013 | 12 | 2013 | USE PHOTOCELL CONTROLS | $265 | $320 | Implemented |
MZ0099 # 05 Y:2012 | 05 | 2012 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $3,108 | $22,500 | Implemented |
MZ0099 # 04 Y:2012 | 04 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,358 | $940 | Implemented |
MZ0099 # 03 Y:2012 | 03 | 2012 | INSTALL OCCUPANCY SENSORS | $2,144 | $2,080 | Implemented |
MZ0099 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,582 | $33,200 | Implemented |
MZ0099 # 01 Y:2012 | 01 | 2012 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $43,935 | $92,930 | Implemented |
KU0367 # 01 Y:1992 | 01 | 1992 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,720 | $37 | Implemented |
MO0055 # 07 Y:1992 | 07 | 1992 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $134 | $2,031 | Not Implemented |
MO0055 # 06 Y:1992 | 06 | 1992 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,657 | $0 | Not Implemented |
MO0055 # 05 Y:1992 | 05 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $175 | $339 | Not Implemented |