Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsSIC | 335 | Nonferrous Rolling And Drawing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0400 # 02 Y:2015 | 02 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,648 | $512 | Implemented |
LE0400 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,673 | $1,000 | Implemented |
LE0400 # 07 Y:2015 | 07 | 2015 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,457 | $3,025 | Implemented |
LE0400 # 09 Y:2015 | 09 | 2015 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $9,334 | $16,500 | Implemented |
LE0400 # 10 Y:2015 | 10 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,729 | $48,067 | Implemented |
LE0400 # 12 Y:2015 | 12 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,188 | $5,469 | Implemented |
LE0400 # 13 Y:2015 | 13 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,886 | $69,160 | Implemented |
LE0400 # 14 Y:2015 | 14 | 2015 | USE RADIANT HEATER FOR SPOT HEATING | $5,902 | $24,000 | Implemented |
LE0400 # 15 Y:2015 | 15 | 2015 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,678 | $6,940 | Implemented |
LE0400 # 16 Y:2015 | 16 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,312 | $35,000 | Implemented |
LE0400 # 01 Y:2015 | 01 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $16,723 | $28 | Implemented |
RU0047 # 05 Y:1989 | 05 | 1989 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,670 | $594 | Implemented |
RU0047 # 07 Y:1989 | 07 | 1989 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,869 | $0 | Implemented |
RU0047 # 06 Y:1989 | 06 | 1989 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,506 | $0 | Implemented |
RU0047 # 02 Y:1989 | 02 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,029 | $0 | Implemented |
RU0047 # 01 Y:1989 | 01 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,402 | $441 | Implemented |
ST0018 # 10 Y:1985 | 10 | 1985 | INSULATE BARE EQUIPMENT | $599 | $1,263 | Implemented |
ST0018 # 02 Y:1985 | 02 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $679 | $0 | Implemented |
ST0018 # 05 Y:1985 | 05 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,502 | $453 | Implemented |
ST0018 # 06 Y:1985 | 06 | 1985 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,390 | $1,900 | Implemented |
ST0018 # 07 Y:1985 | 07 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,356 | $128 | Implemented |
ST0018 # 09 Y:1985 | 09 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,038 | $537 | Implemented |
ST0015 # 02 Y:1985 | 02 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $828 | $0 | Implemented |
ST0015 # 04 Y:1985 | 04 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $180 | $120 | Implemented |
ST0015 # 05 Y:1985 | 05 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,280 | $500 | Implemented |