IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

93

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0967 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $48,377 $1,850 Implemented
GT0967 # 05 Y:2023 05 2023 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,843 $24,000 Not Implemented
GT0967 # 03 Y:2023 03 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,800 $1,000 Implemented
GT0967 # 04 Y:2023 04 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $968 $576 Implemented
GT0967 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $237,120 $2,593,008 Not Implemented
GT0967 # 07 Y:2023 07 2023 OPTIMIZE PLANT POWER FACTOR $2,881 $13,403 Not Implemented
GT0967 # 01 Y:2023 01 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $23,763 $800 Implemented
GT0888 # 06 Y:2012 06 2012 INSTALL OCCUPANCY SENSORS $12,520 $18,060 Not Implemented
GT0888 # 04 Y:2012 04 2012 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $2,915 $1,680 Not Implemented
GT0888 # 01 Y:2012 01 2012 USE SYNTHETIC LUBRICANT $32,596 $0 Not Implemented
GT0888 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $100 $0 Not Implemented
GT0888 # 03 Y:2012 03 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,563 $2,250 Not Implemented
GT0888 # 05 Y:2012 05 2012 RECOVER WASTE HEAT FROM EQUIPMENT $17,200 $15,000 Not Implemented
GT0888 # 08 Y:2012 08 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,305 $18,600 Not Implemented
GT0888 # 07 Y:2012 07 2012 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $24,690 $109,600 Not Implemented
GT0848 # 01 Y:2008 01 2008 RECOVER WASTE HEAT FROM EQUIPMENT $11,250 $19,500 Not Implemented
GT0848 # 02 Y:2008 02 2008 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $180,800 $541,073 Not Implemented
GT0848 # 06 Y:2008 06 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,164 $10,000 Not Implemented
GT0848 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,718 $3,250 Implemented
GT0848 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,088 $0 Implemented
GT0848 # 03 Y:2008 03 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $340 $1,000 Implemented
GT0815 # 04 Y:2005 04 2005 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $40,800 $110,000 Not Implemented
GT0815 # 01 Y:2005 01 2005 RECOVER WASTE HEAT FROM EQUIPMENT $116,700 $90,000 Not Implemented
GT0815 # 06 Y:2005 06 2005 USE SYNTHETIC LUBRICANT $4,865 $0 Implemented
GT0815 # 05 Y:2005 05 2005 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $4,041 $1,500 Not Implemented