Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
51
matching recommendationsSIC | 335 | Nonferrous Rolling And Drawing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0033 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $814 | $270 | Not Implemented |
MU0033 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $872 | $524 | Not Implemented |
MU0033 # 01 Y:2023 | 01 | 2023 | INSULATE BARE EQUIPMENT | $1,490 | $18 | Not Implemented |
MU0033 # 04 Y:2023 | 04 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,201 | $0 | Not Implemented |
MU0033 # 03 Y:2023 | 03 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,285 | $5,918 | Not Implemented |
UMS013 # 01 Y:2012 | 01 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $320,000 | $600,000 | Not Implemented |
UMS013 # 04 Y:2012 | 04 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $465,000 | $700,000 | Not Implemented |
UMS013 # 02 Y:2012 | 02 | 2012 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $106,000 | $200,000 | Not Implemented |
UMS013 # 03 Y:2012 | 03 | 2012 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $673,000 | $1,000,000 | Not Implemented |
UMS013 # 05 Y:2012 | 05 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $137,000 | $0 | Not Implemented |
UM0338 # 02 Y:2008 | 02 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $16,908 | $4,000 | Not Implemented |
UM0338 # 05 Y:2008 | 05 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,107 | $900 | Not Implemented |
UM0338 # 01 Y:2008 | 01 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $30,146 | $38,350 | Not Implemented |
UM0338 # 07 Y:2008 | 07 | 2008 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $257 | $1,095 | Not Implemented |
UM0338 # 06 Y:2008 | 06 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,305 | $4,480 | Not Implemented |
UM0338 # 03 Y:2008 | 03 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,301 | $19,680 | Not Implemented |
UM0338 # 04 Y:2008 | 04 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,640 | $1,400 | Not Implemented |
UM0338 # 08 Y:2008 | 08 | 2008 | INSTALL OCCUPANCY SENSORS | $103 | $270 | Not Implemented |
UM0227 # 04 Y:2003 | 04 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,016 | $1,920 | Not Implemented |
UM0227 # 01 Y:2003 | 01 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,930 | $1,000 | Not Implemented |
UM0227 # 08 Y:2003 | 08 | 2003 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $303 | $700 | Not Implemented |
UM0227 # 06 Y:2003 | 06 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,800 | $1,000 | Not Implemented |
UM0227 # 07 Y:2003 | 07 | 2003 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,640 | $1,300 | Implemented |
UM0227 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,000 | $1,725 | Implemented |
UM0227 # 03 Y:2003 | 03 | 2003 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $5,893 | $10,000 | Not Implemented |