Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,036
matching recommendationsSIC | 335 | Nonferrous Rolling And Drawing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0121 # 12 Y:2013 | 12 | 2013 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $658 | $0 | Implemented |
MZ0121 # 13 Y:2013 | 13 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $209 | $400 | Not Implemented |
MA0705 # 01 Y:2013 | 01 | 2013 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $8,642 | $200 | Not Implemented |
MA0705 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,284 | $19,400 | Implemented |
MA0705 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,053 | $2,800 | Implemented |
MA0705 # 04 Y:2013 | 04 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,037 | $8,350 | Not Implemented |
MA0705 # 05 Y:2013 | 05 | 2013 | OPTIMIZE PLANT POWER FACTOR | $3,939 | $13,700 | Implemented |
MA0705 # 06 Y:2013 | 06 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,632 | $4,231 | Not Implemented |
MA0705 # 07 Y:2013 | 07 | 2013 | PAY UTILITY BILLS ON TIME | $1,191 | $500 | Implemented |
MA0705 # 08 Y:2013 | 08 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $244 | $497 | Not Implemented |
LE0356 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,905 | $5,175 | Implemented |
LE0356 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,126 | $3,215 | Implemented |
LE0356 # 03 Y:2013 | 03 | 2013 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $10,894 | $51,200 | Not Implemented |
LE0356 # 04 Y:2013 | 04 | 2013 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $146 | $338 | Not Implemented |
LE0356 # 05 Y:2013 | 05 | 2013 | ADJUST BURNERS FOR EFFICIENT OPERATION | $756 | $0 | Implemented |
LE0356 # 06 Y:2013 | 06 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,451 | $520 | Not Implemented |
LE0356 # 07 Y:2013 | 07 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,343 | $1,000 | Not Implemented |
LE0356 # 08 Y:2013 | 08 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,139 | $1,500 | Not Implemented |
LE0356 # 09 Y:2013 | 09 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,341 | $0 | Implemented |
LE0356 # 10 Y:2013 | 10 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,399 | $3,700 | Implemented |
LE0356 # 11 Y:2013 | 11 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,608 | $25,060 | Not Implemented |
LE0356 # 12 Y:2013 | 12 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,638 | $1,086 | Implemented |
UMS013 # 01 Y:2012 | 01 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $320,000 | $600,000 | Not Implemented |
UMS013 # 02 Y:2012 | 02 | 2012 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $106,000 | $200,000 | Not Implemented |
UMS013 # 03 Y:2012 | 03 | 2012 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $673,000 | $1,000,000 | Not Implemented |