IAC logo
IAC Assessment: NC0488
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0488
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2013
Principal Product Elevator cable
NAICS 335929 - Other Communication and Energy Wire Manufacturing
SIC 3357 - Nonferrous Wiredrawing & Insulating
Sales $50,000,000-$100,000,000
# of Employees 106
Plant Area (Sq.Ft.) 132,000
Annual Production 18,400,000 Pounds
Production Hrs. Annual 6,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $318,682 5,410,539 kWh $0.06
Electricity Demand $207,447 11,610 kW-months/year $17.87
Electricity Fees $5,122 - $ -
Natural Gas $22,998 1,944 MMBtu $11.83
TOTAL ENERGY COSTS $554,249
RECOMMENDED SAVINGS* $103,117 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,383
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #1 Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Fuel Oil #1 Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
01: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS Savings:
$83,386
Cost:
$250,000
$4,672 80,000 $121,938 9,609 - - $(-28,224) (-1,092) - - $(-15,000) - $4,672
80,000
kWh
$121,938
9,609
kW-months/year
-
-
MMBtu
$(-28,224)
(-1,092)
MMBtu
-
-
$
$(-15,000)
-
$
02: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS Savings:
$6,453
Cost:
$300
$196 3,360 $6,800 326 $(-543) (-45) - - - - - - $196
3,360
kWh
$6,800
326
kW-months/year
$(-543)
(-45)
MMBtu
-
-
MMBtu
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$627
Cost:
$100
$785 13,440 $442 27 - - - - $(-400) - $(-200) - $785
13,440
kWh
$442
27
kW-months/year
-
-
MMBtu
-
-
MMBtu
$(-400)
-
$
$(-200)
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$741
Cost:
$2,535
$474 8,121 $267 16 - - - - - - - - $474
8,121
kWh
$267
16
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,111
Cost:
$1,500
- - - - $5,111 432 - - - - - - -
-
kWh
-
-
kW-months/year
$5,111
432
MMBtu
-
-
MMBtu
-
-
$
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$323
Cost:
$600
$184 3,159 $139 8 - - - - - - - - $184
3,159
kWh
$139
8
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,980
Cost:
$19,622
$6,657 113,988 $3,753 228 - - - - $(-795) - $(-3,635) - $6,657
113,988
kWh
$3,753
228
kW-months/year
-
-
MMBtu
-
-
MMBtu
$(-795)
-
$
$(-3,635)
-
$
08: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$496
Cost:
-
- - $496 20 - - - - - - - - -
-
kWh
$496
20
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$103,117
Cost:
$274,657
$12,968 222,068 $133,835 10,234 $4,568 387 $(-28,224) (-1,092) $(-1,195) - $(-18,835) - $12,968
222,068
kWh
$133,835
10,234
kW-months/year
$4,568
387
MMBtu
$(-28,224)
(-1,092)
MMBtu
$(-1,195)
-
$
$(-18,835)
-
$
TOTAL IMPLEMENTED Savings:
$13,383
Cost:
$20,622
$7,822 133,947 $11,134 589 $(-543) (-45) - - $(-1,195) - $(-3,835) - $7,822
133,947
kWh
$11,134
589
kW-months/year
$(-543)
(-45)
MMBtu
-
-
MMBtu
$(-1,195)
-
$
$(-3,835)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Fuel Oil #1 Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Fuel Oil #1 Personnel Changes Ancillary Material Cost