IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

112

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0293 # 09 Y:2016 09 2016 USE OPTIMUM THICKNESS INSULATION $2,315 $320 Not Implemented
MI0293 # 11 Y:2016 11 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,742 $4,691 Not Implemented
MI0293 # 12 Y:2016 12 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,627 $1,480 Not Implemented
MI0293 # 14 Y:2016 14 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $744 $2,400 Not Implemented
MI0293 # 13 Y:2016 13 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,603 $1,660 Implemented
MI0293 # 15 Y:2016 15 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $286 $605 Not Implemented
MI0293 # 08 Y:2016 08 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,349 $40 Implemented
MI0293 # 07 Y:2016 07 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,436 $760 Not Implemented
UF0448 # 11 Y:2011 11 2011 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $291 $1,730 Not Implemented
UF0448 # 07 Y:2011 07 2011 INSTALL OCCUPANCY SENSORS $3,518 $2,040 Implemented
UF0448 # 10 Y:2011 10 2011 INSULATE BARE EQUIPMENT $5,708 $4,205 Not Implemented
UF0448 # 09 Y:2011 09 2011 USE COMPRESSOR AIR FILTERS $7,367 $1,634 Not Implemented
UF0448 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $3,138 $1,469 Not Implemented
UF0448 # 08 Y:2011 08 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,397 $9,355 Implemented
UF0448 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,949 $11,511 Not Implemented
UF0448 # 01 Y:2011 01 2011 INSTALL SKYLIGHTS $29,002 $67,157 Not Implemented
UF0448 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,395 $1,400 Not Implemented
UF0448 # 05 Y:2011 05 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,034 $1,627 Not Implemented
UF0448 # 03 Y:2011 03 2011 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $20,728 $4,066 Not Implemented
UF0448 # 12 Y:2011 12 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $515,044 $294,885 Not Implemented
MI0139 # 05 Y:2006 05 2006 RECOVER WASTE HEAT FROM EQUIPMENT $3,192 $5,000 Implemented
MI0139 # 04 Y:2006 04 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,787 $40,200 Not Implemented
MI0139 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,014 $50,232 Not Implemented
MI0139 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $26,909 $30 Implemented
MI0139 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $36,785 $1,074 Implemented