IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

94

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0218 # 05 Y:2005 05 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,622 $785 Not Implemented
SU0218 # 04 Y:2005 04 2005 KEEP BOILER TUBES CLEAN $4,058 $0 Not Implemented
SU0218 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,931 $0 Not Implemented
SU0218 # 02 Y:2005 02 2005 USE SYNTHETIC LUBRICANT $27,119 $0 Not Implemented
SU0218 # 01 Y:2005 01 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $34,927 $0 Not Implemented
SU0218 # 07 Y:2005 07 2005 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $169,409 $114,259 Not Implemented
SU0218 # 08 Y:2005 08 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,280 $7,100 Not Implemented
SU0218 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,729 $1,878 Implemented
SU0218 # 10 Y:2005 10 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,025 $15,000 Not Implemented
SU0218 # 11 Y:2005 11 2005 REDUCE VENTILATION AIR $14,692 $17,995 Not Implemented
SU0218 # 12 Y:2005 12 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,220 $53,200 Implemented
SU0218 # 13 Y:2005 13 2005 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $456 $1,166 Not Implemented
SU0218 # 14 Y:2005 14 2005 OPTIMIZE PLANT POWER FACTOR $18,968 $61,178 Implemented
SU0154 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $134 $120 Implemented
SU0154 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $601 $264 Not Implemented
SU0154 # 03 Y:2003 03 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $653 $0 Not Implemented
SU0154 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $692 $133 Implemented
SU0154 # 01 Y:2003 01 2003 UPGRADE CONTROLS ON COMPRESSORS $11,147 $820 Not Implemented
SU0117 # 02 Y:2001 02 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $768 $0 Implemented
SU0117 # 01 Y:2001 01 2001 ELIMINATE/REDUCE AN OPERATION $7,264 $8,085 Not Implemented
SU0117 # 03 Y:2001 03 2001 INSTALL AN UNINTERUPTABLE POWER SUPPLY $153,410 $531,678 Not Implemented
SU0117 # 04 Y:2001 04 2001 OPTIMIZE PLANT POWER FACTOR $12,307 $30,550 Not Implemented
SU0117 # 05 Y:2001 05 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,845 $158 Implemented
SU0117 # 06 Y:2001 06 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,016 $0 Not Implemented
SU0117 # 07 Y:2001 07 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,888 $20,600 Implemented