IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,036

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0105 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $157 $12,760 Not Implemented
AS0105 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $75 $147 Implemented
AS0105 # 03 Y:1993 03 1993 INSTALL OCCUPANCY SENSORS $546 $900 Implemented
AS0105 # 04 Y:1993 04 1993 USE SYNTHETIC LUBRICANT $623 $1,230 Implemented
AS0105 # 05 Y:1993 05 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,244 $350 Implemented
AS0105 # 06 Y:1993 06 1993 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,746 $0 Implemented
AS0105 # 07 Y:1993 07 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $551 $500 Not Implemented
AS0105 # 08 Y:1993 08 1993 INSULATE BARE EQUIPMENT $16,707 $2,040 Not Implemented
AS0105 # 09 Y:1993 09 1993 INSULATE BARE EQUIPMENT $1,707 $820 Implemented
AS0105 # 10 Y:1993 10 1993 COVER OPEN TANKS $5,556 $0 Implemented
AM0189 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,300 $1,500 Implemented
AM0189 # 02 Y:1993 02 1993 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,740 $26,200 Not Implemented
AM0189 # 03 Y:1993 03 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,540 $70 Implemented
AM0189 # 04 Y:1993 04 1993 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,760 $0 Implemented
AM0189 # 05 Y:1993 05 1993 PAY UTILITY BILLS ON TIME $540 $0 Implemented
AM0189 # 06 Y:1993 06 1993 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $150 $0 Not Implemented
AM0189 # 07 Y:1993 07 1993 TURN OFF EQUIPMENT WHEN NOT IN USE $120 $0 Not Implemented
KU0402 # 01 Y:1993 01 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $29,764 $80,000 Not Implemented
KU0402 # 02 Y:1993 02 1993 INSTALL / REPAIR INSULATION ON STEAM LINES $4,617 $3,517 Implemented
KU0402 # 03 Y:1993 03 1993 INSTALL SET-BACK TIMERS $3,940 $1,000 Implemented
KU0402 # 04 Y:1993 04 1993 INSTALL OCCUPANCY SENSORS $377 $200 Not Implemented
KU0402 # 05 Y:1993 05 1993 OPERATE BOILERS ON HIGH FIRE SETTING $3,802 $12,100 Not Implemented
KU0402 # 06 Y:1993 06 1993 USE SYNTHETIC LUBRICANT $3,674 $0 Not Implemented
KU0402 # 07 Y:1993 07 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,493 $11,200 Not Implemented
KU0402 # 08 Y:1993 08 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,395 $378 Not Implemented