Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
93
matching recommendationsSIC | 335 | Nonferrous Rolling And Drawing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0967 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $48,377 | $1,850 | Implemented |
GT0967 # 05 Y:2023 | 05 | 2023 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $5,843 | $24,000 | Not Implemented |
GT0967 # 03 Y:2023 | 03 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,800 | $1,000 | Implemented |
GT0967 # 04 Y:2023 | 04 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $968 | $576 | Implemented |
GT0967 # 06 Y:2023 | 06 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $237,120 | $2,593,008 | Not Implemented |
GT0967 # 07 Y:2023 | 07 | 2023 | OPTIMIZE PLANT POWER FACTOR | $2,881 | $13,403 | Not Implemented |
GT0967 # 01 Y:2023 | 01 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $23,763 | $800 | Implemented |
GT0888 # 06 Y:2012 | 06 | 2012 | INSTALL OCCUPANCY SENSORS | $12,520 | $18,060 | Not Implemented |
GT0888 # 04 Y:2012 | 04 | 2012 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $2,915 | $1,680 | Not Implemented |
GT0888 # 01 Y:2012 | 01 | 2012 | USE SYNTHETIC LUBRICANT | $32,596 | $0 | Not Implemented |
GT0888 # 02 Y:2012 | 02 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $100 | $0 | Not Implemented |
GT0888 # 03 Y:2012 | 03 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,563 | $2,250 | Not Implemented |
GT0888 # 05 Y:2012 | 05 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,200 | $15,000 | Not Implemented |
GT0888 # 08 Y:2012 | 08 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,305 | $18,600 | Not Implemented |
GT0888 # 07 Y:2012 | 07 | 2012 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $24,690 | $109,600 | Not Implemented |
GT0848 # 01 Y:2008 | 01 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,250 | $19,500 | Not Implemented |
GT0848 # 02 Y:2008 | 02 | 2008 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $180,800 | $541,073 | Not Implemented |
GT0848 # 06 Y:2008 | 06 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,164 | $10,000 | Not Implemented |
GT0848 # 04 Y:2008 | 04 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,718 | $3,250 | Implemented |
GT0848 # 05 Y:2008 | 05 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,088 | $0 | Implemented |
GT0848 # 03 Y:2008 | 03 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $340 | $1,000 | Implemented |
GT0815 # 04 Y:2005 | 04 | 2005 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $40,800 | $110,000 | Not Implemented |
GT0815 # 01 Y:2005 | 01 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $116,700 | $90,000 | Not Implemented |
GT0815 # 06 Y:2005 | 06 | 2005 | USE SYNTHETIC LUBRICANT | $4,865 | $0 | Implemented |
GT0815 # 05 Y:2005 | 05 | 2005 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $4,041 | $1,500 | Not Implemented |