IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

51

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0033 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $814 $270 n/a
MU0033 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $872 $524 n/a
MU0033 # 01 Y:2023 01 2023 INSULATE BARE EQUIPMENT $1,490 $18 n/a
MU0033 # 04 Y:2023 04 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,201 $0 n/a
MU0033 # 03 Y:2023 03 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,285 $5,918 n/a
UMS013 # 01 Y:2012 01 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $320,000 $600,000 Not Implemented
UMS013 # 04 Y:2012 04 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $465,000 $700,000 Not Implemented
UMS013 # 02 Y:2012 02 2012 DIRECT WARMEST AIR TO COMBUSTION INTAKE $106,000 $200,000 Not Implemented
UMS013 # 03 Y:2012 03 2012 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $673,000 $1,000,000 Not Implemented
UMS013 # 05 Y:2012 05 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $137,000 $0 Not Implemented
UM0338 # 02 Y:2008 02 2008 RECOVER WASTE HEAT FROM EQUIPMENT $16,908 $4,000 Not Implemented
UM0338 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,107 $900 Not Implemented
UM0338 # 01 Y:2008 01 2008 RECOVER WASTE HEAT FROM EQUIPMENT $30,146 $38,350 Not Implemented
UM0338 # 07 Y:2008 07 2008 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $257 $1,095 Not Implemented
UM0338 # 06 Y:2008 06 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,305 $4,480 Not Implemented
UM0338 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,301 $19,680 Not Implemented
UM0338 # 04 Y:2008 04 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,640 $1,400 Not Implemented
UM0338 # 08 Y:2008 08 2008 INSTALL OCCUPANCY SENSORS $103 $270 Not Implemented
UM0227 # 04 Y:2003 04 2003 RECOVER WASTE HEAT FROM EQUIPMENT $7,016 $1,920 Not Implemented
UM0227 # 01 Y:2003 01 2003 RECOVER WASTE HEAT FROM EQUIPMENT $9,930 $1,000 Not Implemented
UM0227 # 08 Y:2003 08 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $303 $700 Not Implemented
UM0227 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,800 $1,000 Not Implemented
UM0227 # 07 Y:2003 07 2003 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,640 $1,300 Implemented
UM0227 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,000 $1,725 Implemented
UM0227 # 03 Y:2003 03 2003 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $5,893 $10,000 Not Implemented