IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

79

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0394 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,140 $111,625 Not Implemented
MS0394 # 03 Y:2022 03 2022 REPLACE BOILER $28,522 $145,930 Not Implemented
MS0394 # 02 Y:2022 02 2022 INSTALL / REPAIR INSULATION ON STEAM LINES $22,395 $11,275 Not Implemented
MS0375 # 03 Y:2011 03 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $9,190 $5,056 Not Implemented
MS0375 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,069 $317 Implemented
MS0375 # 02 Y:2011 02 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $43,721 $10,838 Not Implemented
MS0375 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $3,053 $3,424 Implemented
MS0375 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,185 $26,542 Implemented
MS0375 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $76,407 $144,900 Implemented
MS0355 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,176 $44,540 Not Implemented
MS0355 # 02 Y:2010 02 2010 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $10,766 $6,978 Not Implemented
MS0355 # 05 Y:2010 05 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,377 $59,145 Not Implemented
MS0355 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,361 $32,037 Not Implemented
MS0369 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,176 $38,740 Not Implemented
MS0369 # 04 Y:2010 04 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,377 $59,145 Not Implemented
MS0369 # 03 Y:2010 03 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,079 $32,037 Not Implemented
MS0369 # 02 Y:2010 02 2010 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $10,766 $6,978 Not Implemented
MS0355 # 07 Y:2010 07 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $290 $595 Not Implemented
MS0355 # 03 Y:2010 03 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,078 $32,037 Not Implemented
MS0355 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $793 $6,281 Not Implemented
MS0294 # 01 Y:2006 01 2006 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $93,222 $290,000 Not Implemented
MS0294 # 07 Y:2006 07 2006 AIR CONDITION ONLY SPACE NECESSARY $381 $240 Not Implemented
MS0294 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,175 $21,180 Not Implemented
MS0294 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,760 $172 Implemented
MS0294 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,240 $609 Implemented