IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

54

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0351 # 01 Y:2004 01 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,410 $1,004 Implemented
UF0351 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,215 $35,243 Implemented
UF0351 # 03 Y:2004 03 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $22,503 $0 Not Implemented
UF0351 # 07 Y:2004 07 2004 RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE $225,920 $200,000 Not Implemented
UF0351 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,480 $3,600 Not Implemented
UF0351 # 06 Y:2004 06 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $16,846 $85,000 Not Implemented
UF0351 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,704 $5,952 Implemented
AS0383 # 09 Y:2004 09 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $406 $367 Not Implemented
AS0383 # 10 Y:2004 10 2004 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $577,735 $9,735 Not Implemented
AS0383 # 08 Y:2004 08 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,942 $600 Not Implemented
AS0383 # 07 Y:2004 07 2004 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $244 $600 Not Implemented
AS0383 # 06 Y:2004 06 2004 COVER OPEN TANKS $4,988 $6,000 Not Implemented
AS0383 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,064 $12,003 Not Implemented
AS0383 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $842 $200 Not Implemented
AS0383 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,498 $120 Not Implemented
AS0383 # 03 Y:2004 03 2004 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $16,320 $40,000 Not Implemented
AS0383 # 04 Y:2004 04 2004 INSTALL OCCUPANCY SENSORS $2,878 $1,350 Not Implemented
MS0248 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,777 $228 n/a
MS0248 # 09 Y:2004 09 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $560 $1,033 n/a
MS0248 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,390 $9,688 n/a
MS0248 # 06 Y:2004 06 2004 BURN WASTE OIL FOR HEAT $2,232 $2,190 n/a
MS0248 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,960 $8,090 n/a
MS0248 # 08 Y:2004 08 2004 APPLY FOR INVESTMENT INCENTIVES $740 $25 n/a
MS0248 # 01 Y:2004 01 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,530 $120 n/a
MS0248 # 02 Y:2004 02 2004 AIR CONDITION ONLY SPACE NECESSARY $4,615 $2,282 n/a