Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
64
matching recommendationsSIC | 335 | Nonferrous Rolling And Drawing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0815 # 09 Y:2005 | 09 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,456 | $39,000 | Implemented |
GT0815 # 08 Y:2005 | 08 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $58,229 | $69,592 | Implemented |
GT0815 # 07 Y:2005 | 07 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $38,800 | $12,500 | Implemented |
GT0815 # 06 Y:2005 | 06 | 2005 | USE SYNTHETIC LUBRICANT | $4,865 | $0 | Implemented |
GT0815 # 05 Y:2005 | 05 | 2005 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $4,041 | $1,500 | Not Implemented |
GT0815 # 04 Y:2005 | 04 | 2005 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $40,800 | $110,000 | Not Implemented |
GT0815 # 03 Y:2005 | 03 | 2005 | ADJUST BURNERS FOR EFFICIENT OPERATION | $62,800 | $36,000 | Not Implemented |
GT0815 # 02 Y:2005 | 02 | 2005 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $84,900 | $37,500 | Not Implemented |
GT0815 # 01 Y:2005 | 01 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $116,700 | $90,000 | Not Implemented |
SU0218 # 05 Y:2005 | 05 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,622 | $785 | Not Implemented |
SU0218 # 14 Y:2005 | 14 | 2005 | OPTIMIZE PLANT POWER FACTOR | $18,968 | $61,178 | Implemented |
SU0218 # 12 Y:2005 | 12 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,220 | $53,200 | Implemented |
SU0218 # 11 Y:2005 | 11 | 2005 | REDUCE VENTILATION AIR | $14,692 | $17,995 | Not Implemented |
SU0218 # 09 Y:2005 | 09 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,729 | $1,878 | Implemented |
SU0218 # 10 Y:2005 | 10 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $13,025 | $15,000 | Not Implemented |
SU0218 # 08 Y:2005 | 08 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,280 | $7,100 | Not Implemented |
SU0218 # 13 Y:2005 | 13 | 2005 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $456 | $1,166 | Not Implemented |
SU0218 # 01 Y:2005 | 01 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $34,927 | $0 | Not Implemented |
SU0218 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,117 | $2,100 | Implemented |
SU0218 # 07 Y:2005 | 07 | 2005 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $169,409 | $114,259 | Not Implemented |
SU0218 # 03 Y:2005 | 03 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,931 | $0 | Not Implemented |
SU0218 # 04 Y:2005 | 04 | 2005 | KEEP BOILER TUBES CLEAN | $4,058 | $0 | Not Implemented |
SU0218 # 02 Y:2005 | 02 | 2005 | USE SYNTHETIC LUBRICANT | $27,119 | $0 | Not Implemented |
WV0318 # 09 Y:2005 | 09 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,258 | $360 | Implemented |
WV0318 # 04 Y:2005 | 04 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $12,757 | $620 | Implemented |