IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

261

matching recommendations
Reset
SIC 3351 Copper Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0294 # 07 Y:2006 07 2006 AIR CONDITION ONLY SPACE NECESSARY $381 $240 Not Implemented
MA0574 # 01 Y:2005 01 2005 USE RADIANT HEATER FOR SPOT HEATING $179,823 $140,865 Implemented
MA0574 # 02 Y:2005 02 2005 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $140,952 $230,000 Implemented
MA0574 # 03 Y:2005 03 2005 BURN A LESS EXPENSIVE GRADE OF FUEL $349,295 $54,400 Not Implemented
MA0574 # 04 Y:2005 04 2005 OPTIMIZE PLANT POWER FACTOR $20,725 $20,215 Not Implemented
MA0574 # 05 Y:2005 05 2005 INSULATE BARE EQUIPMENT $3,466 $1,801 Implemented
MA0574 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $2,911 $5,770 Implemented
MA0574 # 07 Y:2005 07 2005 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $960 $0 Implemented
WV0288 # 01 Y:2004 01 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,469 $2,195 Not Implemented
WV0288 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,141 $360 Implemented
WV0288 # 03 Y:2004 03 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,120 $700 Not Implemented
WV0288 # 04 Y:2004 04 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,061 $250 Not Implemented
WV0288 # 05 Y:2004 05 2004 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $6,212 $1,200 Implemented
WV0288 # 06 Y:2004 06 2004 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $5,772 $27,600 Implemented
WV0288 # 07 Y:2004 07 2004 DEVELOP A REPAIR/REPLACE POLICY $4,573 $1,000 Implemented
WV0288 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,040 $3,210 Not Implemented
WV0288 # 09 Y:2004 09 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,932 $50 Implemented
WV0288 # 10 Y:2004 10 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,739 $575 Implemented
WV0288 # 11 Y:2004 11 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,876 $3,500 Not Implemented
WV0288 # 12 Y:2004 12 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $804 $1,100 Not Implemented
WV0288 # 13 Y:2004 13 2004 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $203 $25 Implemented
WV0288 # 14 Y:2004 14 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $95 $200 Implemented
SU0154 # 01 Y:2003 01 2003 UPGRADE CONTROLS ON COMPRESSORS $11,147 $820 Not Implemented
SU0154 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $692 $133 Implemented
SU0154 # 03 Y:2003 03 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $653 $0 Not Implemented