IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

13

matching recommendations
Reset
SIC 3351 Copper Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0294 # 01 Y:2006 01 2006 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $93,222 $290,000 Not Implemented
MS0294 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,448 $70,420 Not Implemented
MS0294 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,175 $21,180 Not Implemented
MS0294 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,047 $10,811 Not Implemented
MS0294 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,760 $172 Implemented
MS0294 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,240 $609 Implemented
MS0294 # 07 Y:2006 07 2006 AIR CONDITION ONLY SPACE NECESSARY $381 $240 Not Implemented
MS0059 # 01 Y:1996 01 1996 RECOVER WASTE HEAT FROM EQUIPMENT $6,983 $2,422 Not Implemented
MS0059 # 02 Y:1996 02 1996 ADJUST BURNERS FOR EFFICIENT OPERATION $26,347 $1,000 Implemented
MS0059 # 03 Y:1996 03 1996 OPTIMIZE PLANT POWER FACTOR $9,183 $18,000 Not Implemented
MS0059 # 04 Y:1996 04 1996 INSTALL TIMERS AND/OR THERMOSTATS $1,807 $1,160 Not Implemented
MS0059 # 05 Y:1996 05 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $35,986 $23,018 Not Implemented
MS0059 # 06 Y:1996 06 1996 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $88,560 $0 Not Implemented