IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 3353 Aluminum Sheet, Plate, And Foil
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0272 # 02 Y:2008 02 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $53,138 $6,600 Not Implemented
LE0272 # 03 Y:2008 03 2008 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $18,111 $40,000 Not Implemented
LE0272 # 04 Y:2008 04 2008 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $17,652 $6,200 Not Implemented
LE0272 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,361 $272 Implemented
LE0272 # 06 Y:2008 06 2008 INSTALL OCCUPANCY SENSORS $2,647 $480 Not Implemented
LE0272 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,150 $92,543 Not Implemented
LE0272 # 01 Y:2008 01 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $130,841 $80,000 Not Implemented
WV0257 # 14 Y:2003 14 2003 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $954 $110 Implemented
WV0257 # 13 Y:2003 13 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $538 $2,900 Implemented
WV0257 # 12 Y:2003 12 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $19,542 $1,375 Implemented
WV0257 # 11 Y:2003 11 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,974 $6,300 Implemented
WV0257 # 10 Y:2003 10 2003 RECOVER WASTE HEAT FROM EQUIPMENT $47,961 $101,667 Not Implemented
WV0257 # 09 Y:2003 09 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $37,016 $1,000 Implemented
WV0257 # 08 Y:2003 08 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $159,962 $19,820 Not Implemented
WV0257 # 07 Y:2003 07 2003 RECOVER WASTE HEAT FROM EQUIPMENT $10,524 $1,620 Not Implemented
WV0257 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,738 $220 Implemented
WV0257 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,497 $335 Not Implemented
WV0257 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $18,309 $36,855 Implemented
WV0257 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $61,834 $281,530 Implemented
WV0257 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,020 $0 Implemented
WV0257 # 01 Y:2003 01 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,914 $1,100 Not Implemented