Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
768
matching recommendationsSIC | 3354 | Aluminum Extruded Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0434 # 10 Y:2008 | 10 | 2008 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,536 | $280 | Not Implemented |
IA0434 # 11 Y:2008 | 11 | 2008 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $12,653 | $7,425 | Implemented |
IA0434 # 12 Y:2008 | 12 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,902 | $33,345 | Not Implemented |
UM0338 # 01 Y:2008 | 01 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $30,146 | $38,350 | Not Implemented |
UM0338 # 02 Y:2008 | 02 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $16,908 | $4,000 | Not Implemented |
UM0338 # 03 Y:2008 | 03 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,301 | $19,680 | Not Implemented |
UM0338 # 04 Y:2008 | 04 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,640 | $1,400 | Not Implemented |
UM0338 # 05 Y:2008 | 05 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,107 | $900 | Not Implemented |
UM0338 # 06 Y:2008 | 06 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,305 | $4,480 | Not Implemented |
UM0338 # 07 Y:2008 | 07 | 2008 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $257 | $1,095 | Not Implemented |
UM0338 # 08 Y:2008 | 08 | 2008 | INSTALL OCCUPANCY SENSORS | $103 | $270 | Not Implemented |
GT0848 # 01 Y:2008 | 01 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,250 | $19,500 | Not Implemented |
GT0848 # 02 Y:2008 | 02 | 2008 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $180,800 | $541,073 | Not Implemented |
GT0848 # 03 Y:2008 | 03 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $340 | $1,000 | Implemented |
GT0848 # 04 Y:2008 | 04 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,718 | $3,250 | Implemented |
GT0848 # 05 Y:2008 | 05 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,088 | $0 | Implemented |
GT0848 # 06 Y:2008 | 06 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,164 | $10,000 | Not Implemented |
UD0766 # 01 Y:2007 | 01 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $832,000 | $400,000 | Not Implemented |
UD0766 # 02 Y:2007 | 02 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $942,000 | $520,000 | Not Implemented |
UD0766 # 03 Y:2007 | 03 | 2007 | IMPROVE COMBUSTION CONTROL CAPABILITY | $306,000 | $20,000 | Not Implemented |
UD0766 # 04 Y:2007 | 04 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $164,851 | $140,000 | Not Implemented |
UD0766 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $78,420 | $279,770 | Implemented |
UD0766 # 06 Y:2007 | 06 | 2007 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $57,000 | $30,000 | Not Implemented |
UD0766 # 07 Y:2007 | 07 | 2007 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $40,000 | $1,100 | Implemented |
UD0766 # 08 Y:2007 | 08 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $35,800 | $20,000 | Implemented |