IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

52

matching recommendations
Reset
SIC 3354 Aluminum Extruded Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0766 # 06 Y:2007 06 2007 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $57,000 $30,000 Not Implemented
UD0766 # 14 Y:2007 14 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,115 $0 Implemented
UD0766 # 13 Y:2007 13 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,806 $6,000 Not Implemented
UD0766 # 12 Y:2007 12 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,135 $0 Not Implemented
UD0766 # 11 Y:2007 11 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,564 $19,275 Implemented
UD0766 # 10 Y:2007 10 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,343 $85,140 Implemented
UD0766 # 09 Y:2007 09 2007 RECOVER WASTE HEAT FROM EQUIPMENT $26,203 $10,000 Not Implemented
UD0766 # 08 Y:2007 08 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,800 $20,000 Implemented
UD0766 # 07 Y:2007 07 2007 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $40,000 $1,100 Implemented
UD0766 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $78,420 $279,770 Implemented
UD0766 # 04 Y:2007 04 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $164,851 $140,000 Not Implemented
UD0766 # 03 Y:2007 03 2007 IMPROVE COMBUSTION CONTROL CAPABILITY $306,000 $20,000 Not Implemented
UD0766 # 02 Y:2007 02 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $942,000 $520,000 Not Implemented
UD0766 # 01 Y:2007 01 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $832,000 $400,000 Not Implemented
UD0766 # 15 Y:2007 15 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,068 $2,130 Not Implemented
UD0766 # 16 Y:2007 16 2007 INSTALL OCCUPANCY SENSORS $1,641 $6,210 Not Implemented
WV0318 # 04 Y:2005 04 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,757 $620 Implemented
WV0318 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,582 $11,537 Not Implemented
WV0318 # 07 Y:2005 07 2005 DEVELOP A REPAIR/REPLACE POLICY $4,198 $330 Implemented
WV0318 # 01 Y:2005 01 2005 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $39,332 $8,388 Implemented
WV0318 # 10 Y:2005 10 2005 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,532 $5,220 Implemented
WV0318 # 02 Y:2005 02 2005 RECOVER WASTE HEAT FROM EQUIPMENT $21,012 $3,064 Implemented
WV0318 # 09 Y:2005 09 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,258 $360 Implemented
WV0318 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,670 $587 Implemented
WV0318 # 06 Y:2005 06 2005 COVER OPEN TANKS $5,974 $12,120 Not Implemented