IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 3354 Aluminum Extruded Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0229 # 14 Y:1998 14 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $6,780 $3,756 Not Implemented
AS0229 # 13 Y:1998 13 1998 USE ULTRASONIC CLEANING $79,533 $315,000 Not Implemented
AS0229 # 12 Y:1998 12 1998 MINIMIZE WATER USAGE $945 $400 Not Implemented
AS0229 # 11 Y:1998 11 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,584 $60 Not Implemented
AS0229 # 10 Y:1998 10 1998 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $859 $150 Implemented
AS0229 # 09 Y:1998 09 1998 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,718 $450 Implemented
AS0229 # 08 Y:1998 08 1998 INSTALL TIMERS AND/OR THERMOSTATS $1,094 $1,275 Not Implemented
AS0229 # 07 Y:1998 07 1998 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,284 $6,800 Not Implemented
AS0229 # 06 Y:1998 06 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,691 $300 Not Implemented
AS0229 # 05 Y:1998 05 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,538 $16,808 Not Implemented
AS0229 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $352 $435 Implemented
AS0229 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,030 $56,554 Implemented
AS0229 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,979 $200 Implemented
AS0229 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,509 $12,941 Not Implemented
AM0330 # 15 Y:1998 15 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $170 $0 Implemented
AM0330 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $19,460 $17,210 Not Implemented
AM0330 # 14 Y:1998 14 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $239 $745 Implemented
AM0330 # 13 Y:1998 13 1998 USE SYNTHETIC LUBRICANT $275 $0 Implemented
AM0330 # 12 Y:1998 12 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $340 $20 Implemented
AM0330 # 11 Y:1998 11 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $405 $0 Implemented
AM0330 # 10 Y:1998 10 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $420 $0 Implemented
AM0330 # 09 Y:1998 09 1998 PURCHASE EQUIPMENT INSTEAD OF LEASING $814 $1,120 Not Implemented
AM0330 # 08 Y:1998 08 1998 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,260 $40 Implemented
AM0330 # 07 Y:1998 07 1998 CHECK FOR ACCURACY OF UTILITY / POWER METERS $1,440 $0 Implemented
AM0330 # 06 Y:1998 06 1998 PAY UTILITY BILLS ON TIME $1,938 $0 Implemented