Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
22
matching recommendationsSIC | 3355 | Aluminum Rolling And Drawing, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0504 # 10 Y:2015 | 10 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $293 | $69 | Implemented |
WV0504 # 09 Y:2015 | 09 | 2015 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,530 | $1,000 | Not Implemented |
WV0504 # 08 Y:2015 | 08 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $1,537 | $556 | Implemented |
WV0504 # 07 Y:2015 | 07 | 2015 | INSTALL SET-BACK TIMERS | $1,890 | $1,060 | Not Implemented |
WV0504 # 06 Y:2015 | 06 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,334 | $486 | Implemented |
WV0504 # 05 Y:2015 | 05 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,624 | $12 | Implemented |
WV0504 # 04 Y:2015 | 04 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,984 | $500 | Implemented |
WV0504 # 03 Y:2015 | 03 | 2015 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $9,770 | $5,240 | Not Implemented |
WV0504 # 02 Y:2015 | 02 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,645 | $15,271 | Implemented |
WV0504 # 01 Y:2015 | 01 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $22,508 | $53,520 | Not Implemented |
WV0280 # 12 Y:2003 | 12 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,953 | $7,230 | Implemented |
WV0280 # 01 Y:2003 | 01 | 2003 | ADJUST BURNERS FOR EFFICIENT OPERATION | $143,927 | $209,000 | Not Implemented |
WV0280 # 11 Y:2003 | 11 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,080 | $477 | Implemented |
WV0280 # 10 Y:2003 | 10 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,633 | $0 | Not Implemented |
WV0280 # 09 Y:2003 | 09 | 2003 | USE SYNTHETIC LUBRICANT | $4,705 | $250 | Implemented |
WV0280 # 08 Y:2003 | 08 | 2003 | BURN WASTE OIL FOR HEAT | $4,718 | $3,500 | Not Implemented |
WV0280 # 07 Y:2003 | 07 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,348 | $100 | Implemented |
WV0280 # 06 Y:2003 | 06 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,252 | $750 | Implemented |
WV0280 # 05 Y:2003 | 05 | 2003 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $23,943 | $45,000 | Not Implemented |
WV0280 # 04 Y:2003 | 04 | 2003 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $27,160 | $750 | Implemented |
WV0280 # 03 Y:2003 | 03 | 2003 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $63,438 | $8,180 | Not Implemented |
WV0280 # 02 Y:2003 | 02 | 2003 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $78,750 | $1,000 | Implemented |