Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
639
matching recommendationsSIC | 3357 | Nonferrous Wiredrawing & Insulating |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ST0018 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,967 | $2,258 | Not Implemented |
ST0018 # 02 Y:1985 | 02 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $679 | $0 | Implemented |
ST0018 # 03 Y:1985 | 03 | 1985 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $533 | $750 | Not Implemented |
ST0018 # 04 Y:1985 | 04 | 1985 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $200 | $100 | Not Implemented |
ST0018 # 05 Y:1985 | 05 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,502 | $453 | Implemented |
ST0018 # 06 Y:1985 | 06 | 1985 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,390 | $1,900 | Implemented |
ST0018 # 07 Y:1985 | 07 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,356 | $128 | Implemented |
ST0018 # 08 Y:1985 | 08 | 1985 | INSTALL AUTOMATIC STACK DAMPER | $2,670 | $1,350 | Not Implemented |
ST0018 # 09 Y:1985 | 09 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,038 | $537 | Implemented |
ST0018 # 10 Y:1985 | 10 | 1985 | INSULATE BARE EQUIPMENT | $599 | $1,263 | Implemented |
ST0018 # 11 Y:1985 | 11 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $502 | $100 | Not Implemented |
KU0149 # 01 Y:1984 | 01 | 1984 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $34,443 | $3,262 | Implemented |
KU0149 # 02 Y:1984 | 02 | 1984 | INSULATE BARE EQUIPMENT | $3,920 | $350 | Implemented |
KU0149 # 03 Y:1984 | 03 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $965 | $400 | Implemented |
KU0149 # 04 Y:1984 | 04 | 1984 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,550 | $75 | Not Implemented |
KU0149 # 05 Y:1984 | 05 | 1984 | INSULATE BARE EQUIPMENT | $666 | $350 | Not Implemented |
KU0149 # 06 Y:1984 | 06 | 1984 | INSULATE BARE EQUIPMENT | $480 | $325 | Not Implemented |
KU0149 # 08 Y:1984 | 08 | 1984 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $1,626 | $700 | Not Implemented |
KU0149 # 09 Y:1984 | 09 | 1984 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,551 | $300 | Implemented |
KU0149 # 10 Y:1984 | 10 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $586 | $300 | Implemented |
KU0149 # 11 Y:1984 | 11 | 1984 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $339 | $350 | Not Implemented |
KU0149 # 12 Y:1984 | 12 | 1984 | REPAIR AND ELIMINATE STEAM LEAKS | $125 | $20 | Implemented |
KU0149 # 13 Y:1984 | 13 | 1984 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $911 | $820 | Implemented |
KU0149 # 14 Y:1984 | 14 | 1984 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $834 | $1,300 | Not Implemented |
KU0149 # 15 Y:1984 | 15 | 1984 | INSULATE BARE EQUIPMENT | $834 | $40 | Not Implemented |