IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

639

matching recommendations
Reset
SIC 3357 Nonferrous Wiredrawing & Insulating
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0487 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,784 $10,912 Not Implemented
AS0487 # 05 Y:2020 05 2020 USE PHOTOCELL CONTROLS $12,092 $5,188 Not Implemented
AM0770 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $28,900 $38,900 Not Implemented
AM0770 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,150 $2,050 Implemented
AM0770 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,260 $27,700 Implemented
AM0770 # 04 Y:2019 04 2019 OPTIMIZE PLANT POWER FACTOR $8,810 $11,400 Not Implemented
AM0770 # 05 Y:2019 05 2019 OPTIMIZE PLANT POWER FACTOR $5,940 $9,940 Not Implemented
AM0770 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,700 $675 Implemented
AM0770 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,840 $500 Implemented
AM0770 # 08 Y:2019 08 2019 USE SYNTHETIC LUBRICANT $794 $0 Not Implemented
AM0770 # 09 Y:2019 09 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,010 $90 Not Implemented
AM0770 # 10 Y:2019 10 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $300 $0 Not Implemented
AM0770 # 11 Y:2019 11 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $175 $0 Not Implemented
UF0517 # 06 Y:2018 06 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $8,963 $0 Implemented
UF0517 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,845 $9,000 Implemented
UF0517 # 04 Y:2018 04 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $21,928 $0 Implemented
UF0517 # 03 Y:2018 03 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $20,334 $78,376 Implemented
UF0517 # 02 Y:2018 02 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $39,058 $11,918 Implemented
UF0517 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $131,032 $232,640 Implemented
LE0449 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,357 $1,000 Implemented
LE0449 # 02 Y:2018 02 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,677 $2,850 Not Implemented
LE0449 # 03 Y:2018 03 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,339 $3,500 Not Implemented
LE0449 # 04 Y:2018 04 2018 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $298,212 $362,400 Not Implemented
LE0449 # 05 Y:2018 05 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $14,930 $20,000 Not Implemented
LE0449 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,078 $3,780 Implemented