Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,394
matching recommendationsSIC | 336 | Nonferrous Foundries (castings) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KS2432 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,859 | $26,012 | n/a |
KS2432 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,507 | $6,920 | n/a |
KS2432 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $191,327 | $1,288,000 | n/a |
KS2432 # 03 Y:2024 | 03 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $8,117 | $0 | n/a |
KS2432 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,611 | $60 | n/a |
KS2432 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $3,811 | $12,700 | n/a |
IP0199 # 08 Y:2024 | 08 | 2024 | INSTALL OCCUPANCY SENSORS | $257 | $668 | n/a |
IP0199 # 02 Y:2024 | 02 | 2024 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $287 | $25 | n/a |
IP0199 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,242 | $85 | n/a |
IP0199 # 09 Y:2024 | 09 | 2024 | REPLACE BOILER | $434,522 | $2,000,000 | n/a |
IP0199 # 03 Y:2024 | 03 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,822 | $2,157 | n/a |
IP0199 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $706 | $1,069 | n/a |
IP0199 # 06 Y:2024 | 06 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,187 | $12,000 | n/a |
IP0199 # 04 Y:2024 | 04 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,284 | $4,422 | n/a |
IP0199 # 05 Y:2024 | 05 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $4,328 | $3,600 | n/a |
WM0220 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $29,665 | $2,875 | n/a |
WM0220 # 01 Y:2024 | 01 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $134,386 | $400,000 | n/a |
WM0220 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,427 | $0 | n/a |
WM0220 # 04 Y:2024 | 04 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,912 | $0 | n/a |
WM0220 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $2,908 | $2,206 | n/a |
WM0219 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,902 | $3,000 | n/a |
WM0219 # 03 Y:2024 | 03 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,325 | $6,594 | n/a |
WM0219 # 04 Y:2024 | 04 | 2024 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $5,229 | $0 | n/a |
WM0219 # 01 Y:2024 | 01 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $35,918 | $200,000 | n/a |
WM0219 # 05 Y:2024 | 05 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,556 | $0 | n/a |