IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
SIC 336 Nonferrous Foundries (castings)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0799 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,442 $14,461 Implemented
MA0799 # 04 Y:2019 04 2019 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $5,709 $2,500 Implemented
MA0799 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,784 $4,000 Implemented
MA0549 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,794 $315 Implemented
MA0549 # 11 Y:2004 11 2004 DISCONNECT BALLASTS $197 $60 Implemented
MA0549 # 06 Y:2004 06 2004 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,412 $0 Implemented
MA0549 # 04 Y:2004 04 2004 IMPROVE COMBUSTION CONTROL CAPABILITY $8,653 $16,100 Implemented
MA0549 # 01 Y:2004 01 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $32,668 $15,495 Implemented
MA0549 # 09 Y:2004 09 2004 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,021 $1,100 Implemented
MA0549 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $1,041 $896 Implemented
MA0419 # 02 Y:1998 02 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $54,360 $118,235 Implemented
MA0419 # 07 Y:1998 07 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,739 $0 Implemented
MA0419 # 06 Y:1998 06 1998 PAY BILLS ON TIME TO AVOID LATE FEES $3,967 $0 Implemented
MA0419 # 05 Y:1998 05 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,822 $9,000 Implemented
MA0419 # 04 Y:1998 04 1998 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $10,000 $3,120 Implemented
MA0419 # 01 Y:1998 01 1998 COVER OPEN TANKS $168,295 $5,000 Implemented
MA0401 # 06 Y:1997 06 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $826 $5,321 Implemented
MA0401 # 04 Y:1997 04 1997 UPGRADE CONTROLS ON COMPRESSORS $4,875 $10,000 Implemented
MA0401 # 03 Y:1997 03 1997 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $1,927 $0 Implemented
MA0401 # 02 Y:1997 02 1997 COVER OPEN TANKS $10,768 $0 Implemented
MA0208 # 02 Y:1991 02 1991 INSULATE BARE EQUIPMENT $4,350 $500 Implemented
MA0208 # 05 Y:1991 05 1991 INSTALL SET-BACK TIMERS $837 $818 Implemented
MA0208 # 01 Y:1991 01 1991 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $5,634 $400 Implemented
MA0208 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $655 $0 Implemented
MA0208 # 03 Y:1991 03 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $787 $965 Implemented