Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
32
matching recommendationsSIC | 336 | Nonferrous Foundries (castings) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0799 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,442 | $14,461 | Implemented |
MA0799 # 04 Y:2019 | 04 | 2019 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $5,709 | $2,500 | Implemented |
MA0799 # 05 Y:2019 | 05 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,784 | $4,000 | Implemented |
MA0549 # 07 Y:2004 | 07 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,794 | $315 | Implemented |
MA0549 # 11 Y:2004 | 11 | 2004 | DISCONNECT BALLASTS | $197 | $60 | Implemented |
MA0549 # 06 Y:2004 | 06 | 2004 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,412 | $0 | Implemented |
MA0549 # 04 Y:2004 | 04 | 2004 | IMPROVE COMBUSTION CONTROL CAPABILITY | $8,653 | $16,100 | Implemented |
MA0549 # 01 Y:2004 | 01 | 2004 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $32,668 | $15,495 | Implemented |
MA0549 # 09 Y:2004 | 09 | 2004 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $1,021 | $1,100 | Implemented |
MA0549 # 08 Y:2004 | 08 | 2004 | INSTALL OCCUPANCY SENSORS | $1,041 | $896 | Implemented |
MA0419 # 02 Y:1998 | 02 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $54,360 | $118,235 | Implemented |
MA0419 # 07 Y:1998 | 07 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,739 | $0 | Implemented |
MA0419 # 06 Y:1998 | 06 | 1998 | PAY BILLS ON TIME TO AVOID LATE FEES | $3,967 | $0 | Implemented |
MA0419 # 05 Y:1998 | 05 | 1998 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $3,822 | $9,000 | Implemented |
MA0419 # 04 Y:1998 | 04 | 1998 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $10,000 | $3,120 | Implemented |
MA0419 # 01 Y:1998 | 01 | 1998 | COVER OPEN TANKS | $168,295 | $5,000 | Implemented |
MA0401 # 06 Y:1997 | 06 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $826 | $5,321 | Implemented |
MA0401 # 04 Y:1997 | 04 | 1997 | UPGRADE CONTROLS ON COMPRESSORS | $4,875 | $10,000 | Implemented |
MA0401 # 03 Y:1997 | 03 | 1997 | AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED | $1,927 | $0 | Implemented |
MA0401 # 02 Y:1997 | 02 | 1997 | COVER OPEN TANKS | $10,768 | $0 | Implemented |
MA0208 # 02 Y:1991 | 02 | 1991 | INSULATE BARE EQUIPMENT | $4,350 | $500 | Implemented |
MA0208 # 05 Y:1991 | 05 | 1991 | INSTALL SET-BACK TIMERS | $837 | $818 | Implemented |
MA0208 # 01 Y:1991 | 01 | 1991 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $5,634 | $400 | Implemented |
MA0208 # 04 Y:1991 | 04 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $655 | $0 | Implemented |
MA0208 # 03 Y:1991 | 03 | 1991 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $787 | $965 | Implemented |