IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

89

matching recommendations
Reset
SIC 336 Nonferrous Foundries (castings)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0639 # 13 Y:2023 13 2023 INSULATE BARE EQUIPMENT $268 $211 Implemented
WV0639 # 04 Y:2023 04 2023 UPGRADE CONTROLS ON COMPRESSORS $17,944 $36,920 Not Implemented
WV0639 # 12 Y:2023 12 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,627 $7,083 Implemented
WV0639 # 02 Y:2023 02 2023 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $76,363 $381,250 Not Implemented
WV0639 # 08 Y:2023 08 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,827 $16,000 Not Implemented
WV0639 # 07 Y:2023 07 2023 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $7,420 $25,000 Not Implemented
WV0639 # 05 Y:2023 05 2023 DEVELOP A REPAIR/REPLACE POLICY $11,555 $2,233 Implemented
WV0639 # 10 Y:2023 10 2023 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $4,843 $10,000 Not Implemented
WV0639 # 06 Y:2023 06 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,297 $100 Implemented
WV0639 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,872 $1,250 Implemented
WV0639 # 01 Y:2023 01 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,281,087 $1,151,450 Not Implemented
WV0639 # 09 Y:2023 09 2023 INSULATE BARE EQUIPMENT $5,246 $3,107 Implemented
WV0639 # 11 Y:2023 11 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,250 $908 Implemented
WV0375 # 09 Y:2008 09 2008 USE DEMAND CONTROLLER OR LOAD SHEDDER $57,494 $25,520 Not Implemented
WV0375 # 19 Y:2008 19 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,275 $0 Not Implemented
WV0375 # 18 Y:2008 18 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,797 $10,125 Implemented
WV0375 # 13 Y:2008 13 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $29,817 $2,000 Implemented
WV0375 # 14 Y:2008 14 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,983 $772 Implemented
WV0375 # 07 Y:2008 07 2008 USE RADIANT HEATER FOR SPOT HEATING $23,729 $37,200 Not Implemented
WV0375 # 08 Y:2008 08 2008 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $59,537 $62,535 Not Implemented
WV0375 # 04 Y:2008 04 2008 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $97,283 $434,500 Not Implemented
WV0375 # 10 Y:2008 10 2008 RECOVER WASTE HEAT FROM EQUIPMENT $34,143 $15,525 Not Implemented
WV0375 # 11 Y:2008 11 2008 USE OPTIMUM THICKNESS INSULATION $33,427 $6,567 Implemented
WV0375 # 05 Y:2008 05 2008 INCREASE AMOUNT OF CONDENSATE RETURNED $84,029 $50,400 Not Implemented
WV0375 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $82,382 $83,840 Implemented