IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

89

matching recommendations
Reset
SIC 336 Nonferrous Foundries (castings)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0127 # 04 Y:2002 04 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $678 $1,000 Not Implemented
LE0127 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,175 $0 Not Implemented
LE0127 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,413 $100 Implemented
LE0127 # 07 Y:2002 07 2002 MODERATE COOLING TOWER OUTLET TEMPERATURE $5,791 $6,500 Not Implemented
LE0127 # 08 Y:2002 08 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,725 $2,500 Not Implemented
LE0127 # 09 Y:2002 09 2002 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $11,681 $3,750 Not Implemented
LE0127 # 10 Y:2002 10 2002 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,572 $0 Implemented
LE0103 # 05 Y:2001 05 2001 RECOVER WASTE HEAT FROM EQUIPMENT $10,676 $7,500 Not Implemented
LE0103 # 04 Y:2001 04 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,904 $12,900 Implemented
LE0103 # 03 Y:2001 03 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,154 $1,600 Implemented
LE0103 # 02 Y:2001 02 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $16,104 $0 Not Implemented
LE0103 # 01 Y:2001 01 2001 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $14,809 $49,595 Not Implemented
LE0103 # 06 Y:2001 06 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $17,100 $12,300 Implemented
WV0111 # 12 Y:1997 12 1997 SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS $1,256 $2,400 Implemented
WV0111 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $338 $96 Not Implemented
WV0111 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,354 $27,486 Implemented
WV0111 # 03 Y:1997 03 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,858 $720 Implemented
WV0111 # 04 Y:1997 04 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,405 $250 Not Implemented
WV0111 # 05 Y:1997 05 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,373 $100 Implemented
WV0111 # 06 Y:1997 06 1997 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $42,260 $0 Implemented
WV0111 # 07 Y:1997 07 1997 USE SHAFT TYPE FURNACES FOR PREHEATING INCOMING MATERIAL $38,225 $20,000 Not Implemented
WV0111 # 08 Y:1997 08 1997 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $58,339 $56,250 Not Implemented
WV0111 # 09 Y:1997 09 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,033 $2,000 Implemented
WV0111 # 10 Y:1997 10 1997 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,079 $0 Implemented
WV0111 # 11 Y:1997 11 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $180 $0 Implemented