Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
111
matching recommendationsSIC | 336 | Nonferrous Foundries (castings) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0327 # 05 Y:2003 | 05 | 2003 | INSTALL OCCUPANCY SENSORS | $596 | $1,131 | Not Implemented |
IA0327 # 06 Y:2003 | 06 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $994 | $303 | Implemented |
IA0327 # 07 Y:2003 | 07 | 2003 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,163 | $500 | Implemented |
IA0327 # 08 Y:2003 | 08 | 2003 | INSTALL EQUIPMENT TO MOVE PRODUCT | $120,640 | $40,000 | Not Implemented |
IA0291 # 01 Y:2002 | 01 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,222 | $685 | Implemented |
IA0291 # 02 Y:2002 | 02 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,929 | $920 | Implemented |
IA0291 # 03 Y:2002 | 03 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,120 | $50 | Not Implemented |
IA0291 # 04 Y:2002 | 04 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,174 | $682 | Not Implemented |
IA0291 # 05 Y:2002 | 05 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,242 | $25,134 | Implemented |
IA0291 # 06 Y:2002 | 06 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,844 | $476 | Implemented |
IA0291 # 07 Y:2002 | 07 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,689 | $7,199 | Implemented |
IA0291 # 08 Y:2002 | 08 | 2002 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $7,328 | $25,016 | Implemented |
IA0291 # 09 Y:2002 | 09 | 2002 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $23,689 | $59,400 | Not Implemented |
IA0291 # 10 Y:2002 | 10 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $55,348 | $77,600 | Implemented |
DS0150 # 01 Y:1999 | 01 | 1999 | USE OPTIMUM THICKNESS INSULATION | $6,312 | $2,897 | Not Implemented |
DS0150 # 02 Y:1999 | 02 | 1999 | INSTALL OCCUPANCY SENSORS | $512 | $483 | Not Implemented |
DS0150 # 03 Y:1999 | 03 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $14,552 | $15,640 | Implemented |
DS0150 # 04 Y:1999 | 04 | 1999 | REDUCE VENTILATION AIR | $32,699 | $30,301 | Implemented |
DS0150 # 05 Y:1999 | 05 | 1999 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $29,468 | $37,220 | Implemented |
DS0150 # 06 Y:1999 | 06 | 1999 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $626 | $400 | Not Implemented |
DS0150 # 07 Y:1999 | 07 | 1999 | PAY BILLS ON TIME TO AVOID LATE FEES | $277 | $0 | Implemented |
DS0141 # 01 Y:1999 | 01 | 1999 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $10,285 | $24,040 | Implemented |
DS0141 # 02 Y:1999 | 02 | 1999 | OPTIMIZE PLANT POWER FACTOR | $4,260 | $4,500 | Implemented |
DS0141 # 03 Y:1999 | 03 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,031 | $700 | Implemented |
DS0141 # 04 Y:1999 | 04 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,348 | $900 | Implemented |