IAC logo
IAC Assessment: IA0291
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0291
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2002
Principal Product Aluminum and Magnesium Castings
NAICS n/a
SIC 3363 - Aluminum Die-castings
Sales $10,000,000-$50,000,000
# of Employees 400
Plant Area (Sq.Ft.) 390,000
Annual Production 550,000 Pounds
Production Hrs. Annual 4,576
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $543,494 15,199,338 kWh $0.04
Electricity Demand $220,105 34,236 kW-months/year $6.43
Natural Gas $537,351 84,812 MMBtu $6.34
TOTAL ENERGY COSTS $1,320,693
RECOMMENDED SAVINGS* $127,585 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $99,602
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,222
Cost:
$685
$4,178 138,790 $3,044 364 - - - - $4,178
138,790
kWh
$3,044
364
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$4,929
Cost:
$920
$2,740 91,019 $2,189 262 - - - - $2,740
91,019
kWh
$2,189
262
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,120
Cost:
$50
$1,226 40,726 $894 107 - - - - $1,226
40,726
kWh
$894
107
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,174
Cost:
$682
$1,461 48,526 $713 85 - - - - $1,461
48,526
kWh
$713
85
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,242
Cost:
$25,134
$8,913 296,113 $4,329 517 - - - - $8,913
296,113
kWh
$4,329
517
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,844
Cost:
$476
$2,835 94,188 $2,009 240 - - - - $2,835
94,188
kWh
$2,009
240
kW-months/year
-
-
MMBtu
-
-
$
07: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$6,689
Cost:
$7,199
- - $6,689 799 - - - - -
-
kWh
$6,689
799
kW-months/year
-
-
MMBtu
-
-
$
08: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$7,328
Cost:
$25,016
$7,328 243,440 - - - - - - $7,328
243,440
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
09: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$23,689
Cost:
$59,400
$31,238 1,037,807 $24,083 2,878 $(-31,632) (-5,013) - - $31,238
1,037,807
kWh
$24,083
2,878
kW-months/year
$(-31,632)
(-5,013)
MMBtu
-
-
$
10: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$55,348
Cost:
$77,600
$1,641 54,522 $1,707 204 - - $52,000 - $1,641
54,522
kWh
$1,707
204
kW-months/year
-
-
MMBtu
$52,000
-
$
TOTAL RECOMMENDED Savings:
$127,585
Cost:
$197,162
$61,560 2,045,131 $45,657 5,456 $(-31,632) (-5,013) $52,000 - $61,560
2,045,131
kWh
$45,657
5,456
kW-months/year
$(-31,632)
(-5,013)
MMBtu
$52,000
-
$
TOTAL IMPLEMENTED Savings:
$99,602
Cost:
$137,030
$27,635 918,072 $19,967 2,386 - - $52,000 - $27,635
918,072
kWh
$19,967
2,386
kW-months/year
-
-
MMBtu
$52,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes