Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,412
matching recommendationsSIC | 336 | Nonferrous Foundries (castings) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LM0028 # 04 Y:2002 | 04 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,807 | $800 | Implemented |
LM0028 # 05 Y:2002 | 05 | 2002 | INSTALL SKYLIGHTS | $5,597 | $10,400 | Not Implemented |
LM0028 # 06 Y:2002 | 06 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,289 | $14,371 | Not Implemented |
LM0028 # 07 Y:2002 | 07 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $147,649 | $242,050 | Not Implemented |
LM0028 # 08 Y:2002 | 08 | 2002 | MODIFY WORKLOAD | $202,176 | $2,200 | Implemented |
LM0028 # 09 Y:2002 | 09 | 2002 | INSTALL SYSTEM TO COLLECT SCRAP | $23,190 | $13,500 | Not Implemented |
LM0028 # 10 Y:2002 | 10 | 2002 | DEVELOP STANDARD OPERATING PROCEDURES | $15,600 | $1,780 | Not Implemented |
LM0024 # 01 Y:2002 | 01 | 2002 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $7,010 | $2,500 | Implemented |
LM0024 # 02 Y:2002 | 02 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,154 | $3,000 | Implemented |
LM0024 # 03 Y:2002 | 03 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $11,155 | $0 | Implemented |
LM0024 # 04 Y:2002 | 04 | 2002 | IMPROVE COMBUSTION CONTROL CAPABILITY | $3,312 | $1,600 | Not Implemented |
LM0024 # 05 Y:2002 | 05 | 2002 | CLEAR AND RENT EXISTING SPACE | $110,000 | $4,500 | Implemented |
LM0024 # 06 Y:2002 | 06 | 2002 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $237,600 | $0 | Implemented |
LM0024 # 07 Y:2002 | 07 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $166,320 | $100,000 | Not Implemented |
LM0024 # 08 Y:2002 | 08 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $47,320 | $0 | Not Implemented |
LE0127 # 01 Y:2002 | 01 | 2002 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,712 | $500 | Implemented |
LE0127 # 02 Y:2002 | 02 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,304 | $0 | Not Implemented |
LE0127 # 03 Y:2002 | 03 | 2002 | IMPROVE LUBRICATION PRACTICES | $1,271 | $200 | Not Implemented |
LE0127 # 04 Y:2002 | 04 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $678 | $1,000 | Not Implemented |
LE0127 # 05 Y:2002 | 05 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,175 | $0 | Not Implemented |
LE0127 # 06 Y:2002 | 06 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,413 | $100 | Implemented |
LE0127 # 07 Y:2002 | 07 | 2002 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $5,791 | $6,500 | Not Implemented |
LE0127 # 08 Y:2002 | 08 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,725 | $2,500 | Not Implemented |
LE0127 # 09 Y:2002 | 09 | 2002 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $11,681 | $3,750 | Not Implemented |
LE0127 # 10 Y:2002 | 10 | 2002 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $1,572 | $0 | Implemented |