Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,412
matching recommendationsSIC | 336 | Nonferrous Foundries (castings) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0193 # 13 Y:2001 | 13 | 2001 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $4,000 | $4,200 | Not Implemented |
IA0269 # 01 Y:2001 | 01 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $587 | $0 | Implemented |
IA0269 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $303 | $24 | Not Implemented |
IA0269 # 03 Y:2001 | 03 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $118 | $165 | Implemented |
IA0269 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $661 | $3,371 | Implemented |
IA0269 # 05 Y:2001 | 05 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $100,798 | $400,189 | n/a |
AS0297 # 01 Y:2001 | 01 | 2001 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $166,920 | $35,000 | n/a |
AS0297 # 02 Y:2001 | 02 | 2001 | INSTALL SKYLIGHTS | $1,527 | $3,086 | Not Implemented |
AS0297 # 03 Y:2001 | 03 | 2001 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $520 | $240 | Not Implemented |
AS0297 # 04 Y:2001 | 04 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $25,657 | $90,000 | n/a |
AS0297 # 05 Y:2001 | 05 | 2001 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $3,360 | $60 | Not Implemented |
AS0297 # 06 Y:2001 | 06 | 2001 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $5,712 | $5,916 | Not Implemented |
SD0277 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,030 | $1,720 | Implemented |
SD0277 # 02 Y:2001 | 02 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $40,552 | $100,000 | Not Implemented |
SD0277 # 03 Y:2001 | 03 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,030 | $5,000 | Not Implemented |
SD0277 # 04 Y:2001 | 04 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $930 | $3,000 | Not Implemented |
SD0277 # 05 Y:2001 | 05 | 2001 | INSTALL SKYLIGHTS | $12,773 | $26,500 | Not Implemented |
SD0277 # 06 Y:2001 | 06 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,765 | $4,674 | Not Implemented |
SD0277 # 07 Y:2001 | 07 | 2001 | INSULATE BARE EQUIPMENT | $3,648 | $7,000 | Implemented |
SD0277 # 08 Y:2001 | 08 | 2001 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $3,680 | $6,000 | Not Implemented |
SD0277 # 09 Y:2001 | 09 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,947 | $5,400 | Not Implemented |
SD0277 # 10 Y:2001 | 10 | 2001 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $12,060 | $20,000 | Not Implemented |
SD0277 # 11 Y:2001 | 11 | 2001 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $2,383 | $2,000 | Implemented |
SD0277 # 12 Y:2001 | 12 | 2001 | MINIMIZE WATER USAGE | $35,500 | $15,000 | Not Implemented |
SD0277 # 13 Y:2001 | 13 | 2001 | INSTALL EQUIPMENT TO MOVE PRODUCT | $337,800 | $640,000 | Not Implemented |