Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
89
matching recommendationsSIC | 336 | Nonferrous Foundries (castings) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0639 # 09 Y:2023 | 09 | 2023 | INSULATE BARE EQUIPMENT | $5,246 | $3,107 | Implemented |
WV0639 # 10 Y:2023 | 10 | 2023 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $4,843 | $10,000 | Not Implemented |
WV0639 # 13 Y:2023 | 13 | 2023 | INSULATE BARE EQUIPMENT | $268 | $211 | Implemented |
WV0639 # 11 Y:2023 | 11 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,250 | $908 | Implemented |
WV0639 # 05 Y:2023 | 05 | 2023 | DEVELOP A REPAIR/REPLACE POLICY | $11,555 | $2,233 | Implemented |
WV0639 # 07 Y:2023 | 07 | 2023 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $7,420 | $25,000 | Not Implemented |
WV0639 # 12 Y:2023 | 12 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,627 | $7,083 | Implemented |
WV0639 # 02 Y:2023 | 02 | 2023 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $76,363 | $381,250 | Not Implemented |
WV0639 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,872 | $1,250 | Implemented |
WV0639 # 08 Y:2023 | 08 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,827 | $16,000 | Not Implemented |
WV0639 # 06 Y:2023 | 06 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,297 | $100 | Implemented |
WV0639 # 01 Y:2023 | 01 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,281,087 | $1,151,450 | Not Implemented |
WV0639 # 04 Y:2023 | 04 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $17,944 | $36,920 | Not Implemented |
WV0375 # 14 Y:2008 | 14 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,983 | $772 | Implemented |
WV0375 # 13 Y:2008 | 13 | 2008 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $29,817 | $2,000 | Implemented |
WV0375 # 12 Y:2008 | 12 | 2008 | DEVELOP A REPAIR/REPLACE POLICY | $32,477 | $1,338 | Implemented |
WV0375 # 10 Y:2008 | 10 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $34,143 | $15,525 | Not Implemented |
WV0375 # 08 Y:2008 | 08 | 2008 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $59,537 | $62,535 | Not Implemented |
WV0375 # 07 Y:2008 | 07 | 2008 | USE RADIANT HEATER FOR SPOT HEATING | $23,729 | $37,200 | Not Implemented |
WV0375 # 06 Y:2008 | 06 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $82,382 | $83,840 | Implemented |
WV0375 # 05 Y:2008 | 05 | 2008 | INCREASE AMOUNT OF CONDENSATE RETURNED | $84,029 | $50,400 | Not Implemented |
WV0375 # 04 Y:2008 | 04 | 2008 | INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER | $97,283 | $434,500 | Not Implemented |
WV0375 # 19 Y:2008 | 19 | 2008 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,275 | $0 | Not Implemented |
WV0375 # 09 Y:2008 | 09 | 2008 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $57,494 | $25,520 | Not Implemented |
WV0375 # 01 Y:2008 | 01 | 2008 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $1,181,139 | $1,147,130 | Not Implemented |