Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
112
matching recommendationsSIC | 336 | Nonferrous Foundries (castings) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0221 # 03 Y:2002 | 03 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,744 | $1,500 | Implemented |
BD0221 # 07 Y:2002 | 07 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $529 | $900 | Not Implemented |
BD0221 # 01 Y:2002 | 01 | 2002 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $25,075 | $56,000 | Not Implemented |
BD0221 # 08 Y:2002 | 08 | 2002 | INSTALL OCCUPANCY SENSORS | $365 | $4,000 | Implemented |
BD0221 # 06 Y:2002 | 06 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $555 | $0 | Implemented |
BD0221 # 05 Y:2002 | 05 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,881 | $3,000 | Implemented |
BD0221 # 02 Y:2002 | 02 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,340 | $1,500 | Implemented |
BD0221 # 09 Y:2002 | 09 | 2002 | CLEAR AND RENT EXISTING SPACE | $5,076 | $1,000 | Not Implemented |
BD0221 # 04 Y:2002 | 04 | 2002 | USE RADIANT HEATER FOR SPOT HEATING | $2,178 | $3,000 | Not Implemented |
BD0221 # 10 Y:2002 | 10 | 2002 | AUTOMATE PAYROLL SYSTEM | $1,365 | $2,500 | Not Implemented |
BD0220 # 05 Y:2002 | 05 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,480 | $1,700 | Not Implemented |
BD0220 # 14 Y:2002 | 14 | 2002 | RECYCLE CASTING SAND | $1,621 | $2,000 | Not Implemented |
BD0220 # 13 Y:2002 | 13 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $154 | $180 | Not Implemented |
BD0220 # 12 Y:2002 | 12 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $222 | $80 | Not Implemented |
BD0220 # 01 Y:2002 | 01 | 2002 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $97,351 | $42,000 | Not Implemented |
BD0220 # 09 Y:2002 | 09 | 2002 | INSTALL OCCUPANCY SENSORS | $1,733 | $900 | Implemented |
BD0220 # 11 Y:2002 | 11 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $902 | $3,010 | Not Implemented |
BD0220 # 07 Y:2002 | 07 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,161 | $0 | Implemented |
BD0220 # 16 Y:2002 | 16 | 2002 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $14,760 | $2,500 | Not Implemented |
BD0220 # 03 Y:2002 | 03 | 2002 | SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM | $12,225 | $5,000 | Not Implemented |
BD0220 # 04 Y:2002 | 04 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,957 | $900 | Implemented |
BD0220 # 08 Y:2002 | 08 | 2002 | INSTALL AUTOMATIC STACK DAMPER | $1,938 | $2,500 | Not Implemented |
BD0220 # 10 Y:2002 | 10 | 2002 | INSTALL TURBULATORS | $925 | $3,200 | Not Implemented |
BD0220 # 02 Y:2002 | 02 | 2002 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $30,813 | $19,400 | Implemented |
BD0220 # 06 Y:2002 | 06 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,308 | $3,000 | Implemented |