IAC Assessment: BD0220
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0220
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2002
Principal Product Non-Ferrous Castings
NAICS n/a
SIC 3365 - Aluminum Foundries
Sales $5,000,000-$10,000,000
# of Employees 120
Plant Area (Sq.Ft.) 140,000
Annual Production 2,450,000 Pounds
Production Hrs. Annual 10,296
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $113,305 4,618,304 kWh $0.02
Electricity Demand $205,965 25,207 kW-months/year $8.17
Electricity Fees $(-22,816) - $ -
Natural Gas $224,921 34,795 MMBtu $6.46
TOTAL ENERGY COSTS $525,230
RECOMMENDED SAVINGS* $234,930 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $41,972
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$97,351
Cost:
$42,000
$75,767 3,092,544 $60,736 7,434 $(-39,152) (-6,057) - - - - - - - - $75,767
3,092,544
kWh
$60,736
7,434
kW-months/year
$(-39,152)
(-6,057)
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$30,813
Cost:
$19,400
- - - - $30,813 4,349 - - - - - - - - -
-
kWh
-
-
kW-months/year
$30,813
4,349
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.2191 SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM Savings:
$12,225
Cost:
$5,000
- - - - $12,225 1,726 - - - - - - - - -
-
kWh
-
-
kW-months/year
$12,225
1,726
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,957
Cost:
$900
$2,134 87,042 $1,823 223 - - - - - - - - - - $2,134
87,042
kWh
$1,823
223
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,480
Cost:
$1,700
$2,032 82,949 $1,448 177 - - - - - - - - - - $2,032
82,949
kWh
$1,448
177
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,308
Cost:
$3,000
$1,783 72,782 $1,525 187 - - - - - - - - - - $1,783
72,782
kWh
$1,525
187
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,161
Cost:
-
$1,165 47,558 $996 152 - - - - - - - - - - $1,165
47,558
kWh
$996
152
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
08: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$1,938
Cost:
$2,500
- - - - $1,938 274 - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,938
274
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,733
Cost:
$900
$986 40,260 $747 91 - - - - - - - - - - $986
40,260
kWh
$747
91
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
10: 2.1222 INSTALL TURBULATORS Savings:
$925
Cost:
$3,200
- - - - $925 131 - - - - - - - - -
-
kWh
-
-
kW-months/year
$925
131
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
11: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$902
Cost:
$3,010
$548 22,385 $354 43 - - - - - - - - - - $548
22,385
kWh
$354
43
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$222
Cost:
$80
$88 3,586 $62 8 - - - - $72 - - - - - $88
3,586
kWh
$62
8
kW-months/year
-
-
MMBtu
-
-
lb
$72
-
$
-
-
$
-
-
$
13: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$154
Cost:
$180
$49 1,997 $22 3 - - - - $35 - $48 - - - $49
1,997
kWh
$22
3
kW-months/year
-
-
MMBtu
-
-
lb
$35
-
$
$48
-
$
-
-
$
14: 3.5221 RECYCLE CASTING SAND Savings:
$1,621
Cost:
$2,000
- - - - - - $1,621 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,621
-
lb
-
-
$
-
-
$
-
-
$
15: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$53,010
Cost:
$1,000
- - - - - - - - - - - - $53,010 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
$53,010
-
$
16: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$14,760
Cost:
$2,500
- - - - - - - - - - - - $14,760 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
$14,760
-
$
17: 4.4470 AUTOMATE PAYROLL SYSTEM Savings:
$6,370
Cost:
$2,500
- - - - - - - - - - - - $6,370 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
$6,370
-
$
TOTAL RECOMMENDED Savings:
$234,930
Cost:
$89,870
$84,552 3,451,103 $67,713 8,318 $6,749 423 $1,621 - $107 - $48 - $74,140 - $84,552
3,451,103
kWh
$67,713
8,318
kW-months/year
$6,749
423
MMBtu
$1,621
-
lb
$107
-
$
$48
-
$
$74,140
-
$
TOTAL IMPLEMENTED Savings:
$41,972
Cost:
$24,200
$6,068 247,642 $5,091 653 $30,813 4,349 - - - - - - - - $6,068
247,642
kWh
$5,091
653
kW-months/year
$30,813
4,349
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost