IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
SIC 336 Nonferrous Foundries (castings)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0139 # 05 Y:2019 05 2019 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $11,010 $44,400 Not Implemented
WM0139 # 09 Y:2019 09 2019 INSULATE BARE EQUIPMENT $1,379 $1,600 Not Implemented
WM0139 # 01 Y:2019 01 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $19,133 $12,100 Not Implemented
WM0139 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,513 $10,050 Not Implemented
WM0139 # 07 Y:2019 07 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,014 $4,600 Not Implemented
WM0139 # 02 Y:2019 02 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,210 $23,025 Not Implemented
WM0139 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,947 $20,250 Not Implemented
WM0139 # 08 Y:2019 08 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,399 $2,250 Implemented
WM0139 # 04 Y:2019 04 2019 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $11,403 $2,900 Not Implemented
WM0134 # 07 Y:2019 07 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $865 $164 Not Implemented
WM0134 # 06 Y:2019 06 2019 INSTALL OCCUPANCY SENSORS $3,406 $690 Not Implemented
WM0134 # 05 Y:2019 05 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,990 $9,800 Not Implemented
WM0134 # 04 Y:2019 04 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,059 $1,610 Not Implemented
WM0134 # 01 Y:2019 01 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $18,166 $70,712 Not Implemented
WM0134 # 02 Y:2019 02 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,318 $20,000 Not Implemented
WM0134 # 03 Y:2019 03 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,856 $1,728 Not Implemented
MA0799 # 06 Y:2019 06 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,202 $5,200 Not Implemented
MA0799 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,784 $4,000 Implemented
MA0799 # 04 Y:2019 04 2019 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $5,709 $2,500 Implemented
MA0799 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,442 $14,461 Implemented
MA0799 # 02 Y:2019 02 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,826 $47,870 Not Implemented
MA0799 # 01 Y:2019 01 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $27,506 $138,640 Not Implemented
LE0467 # 06 Y:2019 06 2019 PREHEAT COMBUSTION AIR WITH WASTE HEAT $9,352 $35,000 Not Implemented
LE0467 # 05 Y:2019 05 2019 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $14,748 $50,000 Not Implemented
LE0467 # 03 Y:2019 03 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,990 $2,000 Implemented