Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsSIC | 336 | Nonferrous Foundries (castings) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0139 # 05 Y:2019 | 05 | 2019 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $11,010 | $44,400 | Not Implemented |
WM0139 # 09 Y:2019 | 09 | 2019 | INSULATE BARE EQUIPMENT | $1,379 | $1,600 | Not Implemented |
WM0139 # 01 Y:2019 | 01 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $19,133 | $12,100 | Not Implemented |
WM0139 # 06 Y:2019 | 06 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,513 | $10,050 | Not Implemented |
WM0139 # 07 Y:2019 | 07 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,014 | $4,600 | Not Implemented |
WM0139 # 02 Y:2019 | 02 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $16,210 | $23,025 | Not Implemented |
WM0139 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,947 | $20,250 | Not Implemented |
WM0139 # 08 Y:2019 | 08 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,399 | $2,250 | Implemented |
WM0139 # 04 Y:2019 | 04 | 2019 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $11,403 | $2,900 | Not Implemented |
WM0134 # 07 Y:2019 | 07 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $865 | $164 | Not Implemented |
WM0134 # 06 Y:2019 | 06 | 2019 | INSTALL OCCUPANCY SENSORS | $3,406 | $690 | Not Implemented |
WM0134 # 05 Y:2019 | 05 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,990 | $9,800 | Not Implemented |
WM0134 # 04 Y:2019 | 04 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,059 | $1,610 | Not Implemented |
WM0134 # 01 Y:2019 | 01 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $18,166 | $70,712 | Not Implemented |
WM0134 # 02 Y:2019 | 02 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $13,318 | $20,000 | Not Implemented |
WM0134 # 03 Y:2019 | 03 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,856 | $1,728 | Not Implemented |
MA0799 # 06 Y:2019 | 06 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,202 | $5,200 | Not Implemented |
MA0799 # 05 Y:2019 | 05 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,784 | $4,000 | Implemented |
MA0799 # 04 Y:2019 | 04 | 2019 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $5,709 | $2,500 | Implemented |
MA0799 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,442 | $14,461 | Implemented |
MA0799 # 02 Y:2019 | 02 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $17,826 | $47,870 | Not Implemented |
MA0799 # 01 Y:2019 | 01 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $27,506 | $138,640 | Not Implemented |
LE0467 # 06 Y:2019 | 06 | 2019 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $9,352 | $35,000 | Not Implemented |
LE0467 # 05 Y:2019 | 05 | 2019 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $14,748 | $50,000 | Not Implemented |
LE0467 # 03 Y:2019 | 03 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,990 | $2,000 | Implemented |