Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,106
matching recommendationsSIC | 3363 | Aluminum Die-castings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0312 # 07 Y:2005 | 07 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,807 | $3,279 | Not Implemented |
SF0312 # 08 Y:2005 | 08 | 2005 | INSTALL OCCUPANCY SENSORS | $2,086 | $3,379 | Not Implemented |
SF0312 # 09 Y:2005 | 09 | 2005 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,715 | $2,450 | Not Implemented |
SF0312 # 10 Y:2005 | 10 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,518 | $17,604 | Implemented |
SF0312 # 11 Y:2005 | 11 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,972 | $4,622 | Implemented |
SF0312 # 12 Y:2005 | 12 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,062 | $101,583 | Not Implemented |
SF0312 # 13 Y:2005 | 13 | 2005 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,414 | $27,090 | Implemented |
UD0726 # 01 Y:2005 | 01 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $222,216 | $3,730 | Implemented |
UD0726 # 02 Y:2005 | 02 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $157,981 | $295,540 | Not Implemented |
UD0726 # 03 Y:2005 | 03 | 2005 | USE OPTIMUM THICKNESS INSULATION | $113,135 | $17,165 | Not Implemented |
UD0726 # 04 Y:2005 | 04 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $93,662 | $72,100 | Implemented |
UD0726 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,707 | $93,840 | Implemented |
UD0726 # 06 Y:2005 | 06 | 2005 | REDUCE VENTILATION AIR | $26,800 | $0 | Implemented |
UD0726 # 07 Y:2005 | 07 | 2005 | INSULATE BARE EQUIPMENT | $19,788 | $4,000 | Implemented |
UD0726 # 08 Y:2005 | 08 | 2005 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $19,593 | $40,000 | Not Implemented |
UD0726 # 09 Y:2005 | 09 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,470 | $3,940 | Not Implemented |
UD0726 # 10 Y:2005 | 10 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,819 | $12,560 | Implemented |
UD0726 # 11 Y:2005 | 11 | 2005 | COVER OPEN TANKS | $4,429 | $1,200 | Implemented |
UD0726 # 12 Y:2005 | 12 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,280 | $736 | Implemented |
UD0726 # 13 Y:2005 | 13 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $3,679 | $0 | Implemented |
UD0726 # 14 Y:2005 | 14 | 2005 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $1,948 | $500 | Not Implemented |
UD0726 # 15 Y:2005 | 15 | 2005 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $1,554 | $0 | Implemented |
UD0726 # 16 Y:2005 | 16 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $1,253 | $0 | Implemented |
UD0726 # 17 Y:2005 | 17 | 2005 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $412 | $960 | Implemented |
LM0085 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,324 | $205 | Implemented |