IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,106

matching recommendations
Reset
SIC 3363 Aluminum Die-castings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0345 # 09 Y:2004 09 2004 UPGRADE CONVEYORS $1,225 $2,145 Implemented
IA0345 # 10 Y:2004 10 2004 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $1,689 $1,828 Implemented
IA0345 # 11 Y:2004 11 2004 COVER OPEN TANKS $12,884 $22,000 Implemented
IA0345 # 12 Y:2004 12 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $21,035 $20,180 Implemented
IA0345 # 13 Y:2004 13 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $30,870 $10,000 Implemented
IA0345 # 14 Y:2004 14 2004 IMPROVE SPACE COMFORT CONDITIONING $1,584 $1,170 Not Implemented
IA0345 # 15 Y:2004 15 2004 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $4,290 $1,035 Implemented
IA0345 # 16 Y:2004 16 2004 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $4,290 $1,100 Implemented
IA0345 # 17 Y:2004 17 2004 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $2,145 $399 Implemented
IA0345 # 18 Y:2004 18 2004 MOVE PRODUCT USING MECHANICAL MEANS $11,717 $11,122 Not Implemented
IA0345 # 19 Y:2004 19 2004 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $36,818 $85,000 Not Implemented
WV0295 # 01 Y:2004 01 2004 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $43,287 $120 Not Implemented
WV0295 # 02 Y:2004 02 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $21,546 $0 Not Implemented
WV0295 # 03 Y:2004 03 2004 INSULATE BARE EQUIPMENT $3,815 $2,707 Implemented
WV0295 # 04 Y:2004 04 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,328 $1,525 Not Implemented
WV0295 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,317 $630 Implemented
WV0295 # 06 Y:2004 06 2004 COVER OPEN TANKS $1,229 $2,250 Implemented
WV0295 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,212 $300 Implemented
WV0295 # 08 Y:2004 08 2004 REDUCE DEFECTS BY REDUCING PRODUCT TIPPING $30,991 $1,500 Not Implemented
WV0295 # 09 Y:2004 09 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $775 $60 Implemented
WV0295 # 10 Y:2004 10 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $654 $210 Not Implemented
WV0295 # 11 Y:2004 11 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $604 $1,000 Not Implemented
WV0295 # 12 Y:2004 12 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $396 $0 Implemented
WV0295 # 13 Y:2004 13 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $281 $150 Not Implemented
WV0295 # 14 Y:2004 14 2004 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $245 $165 Implemented