IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,106

matching recommendations
Reset
SIC 3363 Aluminum Die-castings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0335 # 07 Y:2004 07 2004 INSULATE BARE EQUIPMENT $11,767 $12,275 Implemented
IA0335 # 08 Y:2004 08 2004 INSULATE BARE EQUIPMENT $8,410 $6,902 Not Implemented
IA0335 # 09 Y:2004 09 2004 INSULATE BARE EQUIPMENT $1,097 $198 Not Implemented
LM0068 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,854 $5,078 Not Implemented
LM0068 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,564 $0 Not Implemented
LM0068 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $349 $267 Not Implemented
LM0068 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,866 $16,975 Not Implemented
LM0068 # 05 Y:2004 05 2004 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,181 $260 Implemented
LM0068 # 06 Y:2004 06 2004 INSULATE BARE EQUIPMENT $1,079 $120 Not Implemented
LM0068 # 07 Y:2004 07 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,489 $368 Implemented
LM0068 # 08 Y:2004 08 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $40,318 $55,000 Not Implemented
LM0068 # 09 Y:2004 09 2004 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $13,500 $0 Not Implemented
IA0327 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,481 $809 Implemented
IA0327 # 02 Y:2003 02 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $10,028 $1,017 Not Implemented
IA0327 # 03 Y:2003 03 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,928 $104 Implemented
IA0327 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,965 $479 Not Implemented
IA0327 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $596 $1,131 Not Implemented
IA0327 # 06 Y:2003 06 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $994 $303 Implemented
IA0327 # 07 Y:2003 07 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,163 $500 Implemented
IA0327 # 08 Y:2003 08 2003 INSTALL EQUIPMENT TO MOVE PRODUCT $120,640 $40,000 Not Implemented
LM0047 # 01 Y:2003 01 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,457 $6,432 Not Implemented
LM0047 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,703 $200 Implemented
LM0047 # 03 Y:2003 03 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $997 $228 Implemented
LM0047 # 04 Y:2003 04 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $370 $525 Implemented
LM0047 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $837 $1,365 Not Implemented