IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,106

matching recommendations
Reset
SIC 3363 Aluminum Die-castings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0284 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,819 $182 Implemented
IA0284 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $394 $18 Implemented
IA0284 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $216 $213 Implemented
IA0284 # 04 Y:2001 04 2001 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $4,016 $800 Implemented
IA0284 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $613 $159 Implemented
IA0284 # 06 Y:2001 06 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $256 $633 Not Implemented
IA0284 # 07 Y:2001 07 2001 INSTALL OCCUPANCY SENSORS $99 $222 Not Implemented
IA0284 # 08 Y:2001 08 2001 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $19,346 $43,176 Not Implemented
IA0281 # 01 Y:2001 01 2001 UPGRADE OBSOLETE EQUIPMENT $1,996,394 $28,500 Not Implemented
IA0281 # 02 Y:2001 02 2001 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $38,729 $1,405 Not Implemented
IA0281 # 03 Y:2001 03 2001 USE POWER DURING OFF-PEAK PERIODS $8,860 $0 Not Implemented
IA0281 # 04 Y:2001 04 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,217 $1,280 Not Implemented
IA0281 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,253 $1,301 Implemented
IA0281 # 06 Y:2001 06 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,547 $27 Not Implemented
IA0281 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,408 $0 Implemented
IA0281 # 08 Y:2001 08 2001 INSTALL OCCUPANCY SENSORS $812 $1,460 Not Implemented
UM0193 # 02 Y:2001 02 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,550 $3,000 Implemented
UM0193 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,556 $675 Implemented
UM0193 # 04 Y:2001 04 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,365 $1,000 Implemented
UM0193 # 05 Y:2001 05 2001 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $487 $1,000 Not Implemented
UM0193 # 06 Y:2001 06 2001 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $341 $200 Implemented
UM0193 # 07 Y:2001 07 2001 USE RADIANT HEATER FOR SPOT HEATING $942 $4,500 Not Implemented
UM0193 # 08 Y:2001 08 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,160 $2,060 Not Implemented
UM0193 # 09 Y:2001 09 2001 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $9,870 $11,000 Not Implemented
UM0193 # 10 Y:2001 10 2001 REDESIGN PROCESS $40,150 $2,500 Implemented